**24/11/01** - Master bath remodel project involves combining two bathrooms, adding double doors, removing two closets, and converting a bedroom to a dressing room walk in. The secondary vanity in the master was a previous addition which will be removed. Ginny will be taking the upstairs office and I will be moving mine into the [den studio](/notes/house/studio).
|
|
**24/11/01** - Master bath remodel project involves combining two bathrooms, adding double doors, removing two closets, and converting a bedroom to a dressing room walk in. The secondary vanity in the master was a previous addition which will be removed. Ginny will be taking the upstairs office and I will be moving mine into the [den studio](/notes/house/studio).
|
|
|
|
|
|
|
|
+📷 **photos** @ https://davidawindham.com/wha/glenridge/#bath
|
|
|
|
|
|
## Log
|
|
## Log
|
|
|
|
|
|
-- **24/8/04** - Painters
|
|
|
|
-- **24/7/28-29** - Doors/Trim
|
|
|
|
-- **24/7/21-23** - Tile guys
|
|
|
|
-- **24/7/17** - Sliding Glass Door Installation
|
|
|
|
-- **24/7/15** - Insulation
|
|
|
|
-- **24/7/02** - Drywall
|
|
|
|
|
|
+- **25/8/04-8** - Painters
|
|
|
|
+- **25/7/28-29** - Doors/Trim
|
|
|
|
+- **25/7/21-23** - Tile guys
|
|
|
|
+- **25/7/17** - Sliding Glass Door Installation
|
|
|
|
+- **25/7/15** - Insulation
|
|
|
|
+- **25/7/02** - Drywall
|
|
- **25/6/30-7/1** - Electrical
|
|
- **25/6/30-7/1** - Electrical
|
|
- **25/6/17-20** - Plumbing
|
|
- **25/6/17-20** - Plumbing
|
|
- **25/07/10** - Electrician - adjust hall outlet
|
|