@@ -13,49 +13,80 @@ We've had some hiccups along the way, so I just wanted to start list of issues w
|
|
|
**Exterior**
|
|
|
- rear upper deck & railings
|
|
|
- deck light
|
|
|
+- chimney seal, cap, & wrap
|
|
|
- caps on doubled 2x12s
|
|
|
- was told they would be caulked to look like 4x12s
|
|
|
- insulation and pipes in crawlspace
|
|
|
-- proper drainage pipes on hot water heater
|
|
|
-- chimney seal, cap, & wrap
|
|
|
+- gap sealant on gas exhaust
|
|
|
+ - end screens on gas exhaust
|
|
|
+- proper drainage valves on hot water heater
|
|
|
- gutters left metal intact from previous gutters
|
|
|
- - leaving visable gaps under the shingles that are large enough that small critters could enter the attic.
|
|
|
-- missing downspouts on gutters
|
|
|
-- hole in gutter to right of entrance
|
|
|
-- water dripping along wood under upper gutter.
|
|
|
-- leaking downspout connector entrance
|
|
|
+ - leaving visible gaps under the shingles that are large enough that small critters could enter the attic.
|
|
|
+ - missing downspouts on gutters
|
|
|
+ - hole in gutter to right of entrance
|
|
|
+ - water dripping along wood under upper gutter.
|
|
|
+ - leaking downspout connector entrance
|
|
|
- painting in spots
|
|
|
- front doors - were measured but not follow up
|
|
|
+- haul off
|
|
|
+ - truss & doors
|
|
|
+ - ladder from painters
|
|
|
+- replace 3 gallons of exterior paint
|
|
|
+ - or 2 since you're leaving two extra trim
|
|
|
|
|
|
**Interior**
|
|
|
-- missing closet lights
|
|
|
+- electrical
|
|
|
+ - missing closet lights
|
|
|
+ - dimming led cans
|
|
|
+- bathroom hardware
|
|
|
- hvac ductwork
|
|
|
-- damaged sliding doors
|
|
|
-- broken hardware on bifold doors
|
|
|
-- door hardware for bedroom
|
|
|
-- missing foot boards and crown molding
|
|
|
-- crooked wall in bedroom corner
|
|
|
-- lots of bad drywall work
|
|
|
- - tape marks in ceiling
|
|
|
-- sliding door not caulked
|
|
|
- broken shower wand tube
|
|
|
-- downstairs ceiling repair from two separate leaks and jackhammer cracking
|
|
|
-- downstairs bathroom paint
|
|
|
- bathtub not properly installed
|
|
|
- slides around
|
|
|
-- no backsplash or water proofing on the wall of bathtub
|
|
|
-- white caulk on bathtub faucet
|
|
|
+ - no backsplash or water proofing on the wall of bathtub
|
|
|
+ - white caulk on bathtub filler
|
|
|
+- sliding door not caulked
|
|
|
+ - sliding poor trim paint/stain
|
|
|
+- ceiling fan
|
|
|
- paint on tile floor
|
|
|
+- damaged bi-fold doors
|
|
|
+ - broken hardware on bifold doors
|
|
|
+ - split wood on the base of doors
|
|
|
+- door hardware for bedroom
|
|
|
- cracked floor trim from carpet puller
|
|
|
+- closet shelves needs to be split for attic
|
|
|
+ - need to replace closet shelves
|
|
|
+ - need latch on attic door
|
|
|
+- missing baseboards and crown molding
|
|
|
+- carpet doesn't meet baseboards
|
|
|
+- dressing room
|
|
|
+ - drawers/hardware
|
|
|
+ - stained seat top
|
|
|
+ - lighting
|
|
|
+- lots of bad drywall work
|
|
|
+ - crooked wall in bedroom corner
|
|
|
+ - tape marks in ceiling
|
|
|
+ - wavy at bed entrance - too many repair pieces
|
|
|
+- downstairs ceiling repair from two separate leaks and jackhammer cracking
|
|
|
+- downstairs bathroom paint
|
|
|
+- stairwell trim paint baseboards
|
|
|
+
|
|
|
+**Minor**
|
|
|
+- window treatments
|
|
|
+ - tub / vertical blinds
|
|
|
+ - remove curtain rod
|
|
|
+- tv mount
|
|
|
+
|
|
|
|
|
|
## Management
|
|
|
|
|
|
- Timeliness
|
|
|
- slow pace - some contractors will work for just a couple of hours a day for a week.
|
|
|
- took **over a year** to complete the project
|
|
|
+- very little inspection of work
|
|
|
- General contractor has only been by the site once to check up on work
|
|
|
- after the trusses were installed
|
|
|
-- Assistant to GC has only been on site to check on work five times
|
|
|
+- Assistant to GC not on site often
|
|
|
- once was after a leak
|
|
|
- Not much supervision of subs
|
|
|
- Communication lackluster
|
|
@@ -64,51 +95,51 @@ We've had some hiccups along the way, so I just wanted to start list of issues w
|
|
|
- Broken Sewer Line
|
|
|
- blowout line crushed by one of the haul off trucks or the lift equipment
|
|
|
- Subcontractors
|
|
|
- - contractor shit in our backyard - dog was eating something and noticed the roll of toilet paper
|
|
|
+ - contractor 💩 in our backyard - dog was eating something and noticed the roll of toilet paper
|
|
|
- contractors peeing in our driveway
|
|
|
- contractor puked in the yard because he came hungover
|
|
|
- left food trash in buckets upstairs that caused am indoor bug infestation
|
|
|
+ - dumped rotten food in bushes
|
|
|
+ - paint in bushes and on house in cleaning
|
|
|
- had to drive over to GA to confirm quartz because couldn't get what was promised
|
|
|
-- didn't communicate the schluter was horizontal and not vertical
|
|
|
-- didn't fix cut drywall in downstairs bathroom for quite some time
|
|
|
+- didn't fix cut drywall in downstairs bathroom for three months
|
|
|
- left it open and we taped the piece back into it
|
|
|
-- had contractors on site past normal working hours
|
|
|
-- Contractor fishing in pond putting fish in bucket
|
|
|
-- Requested payment before work was completed
|
|
|
- - saying that you had 'had a lot of money' out there
|
|
|
-- promised to charge costs on materials
|
|
|
-- no accountability on the arrival or departure times of subs.
|
|
|
+- contractors on site past normal working hours
|
|
|
+- contractor fishing in pond putting fish in bucket
|
|
|
|
|
|
## Craftsmanship
|
|
|
|
|
|
- studio left without hardware for three months
|
|
|
- leaking seal on pipe that ran into the wall and stained the ceiling on the floor below in both the den and downstairs bathroom
|
|
|
-- hot water install mixed with cold water so we didn't have cold water for a couple days
|
|
|
+- hot water install mixed with cold water
|
|
|
+ - we didn't have cold water for a couple days
|
|
|
- covered existing electrical outlets
|
|
|
- didn't seal off area of drywall sanding
|
|
|
- no ventilation or air treatment
|
|
|
+ - didn't replace hvac intakes
|
|
|
- installed tile inset the wrong direction
|
|
|
- left hvac ducts unpatched for months. I finally patched them.
|
|
|
- poured water under the house instead of piping it out
|
|
|
- left a pile of debris in the yard for three months
|
|
|
- left the old sliding door in the yard for a month
|
|
|
- we personally hauled off several loads of trash
|
|
|
-- popcorn ceiling has visible seam
|
|
|
+- popcorn ceiling has visible seams
|
|
|
- drywall not consistent or square in spots
|
|
|
- dropping drywall at hvac intake
|
|
|
- not square where the corners meet
|
|
|
- didn't use the waterproof type throughout the bathroom
|
|
|
- made patches where it should have been an entire board replaced
|
|
|
- - only partial bathroom in water resistant
|
|
|
- ripped out a closet that didn't need to be removed
|
|
|
- threw away good materials and unnecessary demo
|
|
|
- duct vents, bi-fold doors
|
|
|
- broke glass into the yard by tossing shower doors over the ledge
|
|
|
- didn't plug the two HVAC vents that were ducted into the closed ceiling
|
|
|
- found a previously split truss just one truss back from what was installed
|
|
|
+ - didn't mention it to us
|
|
|
- left the extra truss in our yard for nine months
|
|
|
- didn't patch the ceiling until months after the trusses installed
|
|
|
- $600 heating cost to heat ceiling area
|
|
|
+- didn't tile all the way to the ceiling in shower as requested
|
|
|
- don't clean up after work
|
|
|
- trash/food in yard, nails/metal in bushes
|
|
|
- paint on window hardware
|
|
@@ -117,6 +148,8 @@ We've had some hiccups along the way, so I just wanted to start list of issues w
|
|
|
- didn't install backing support for grab bar
|
|
|
- spilled a heavy amount of paint thinner into the subfloor which then permeated the house for a week causing headaches and eye irritation. So potent that any heating element like our oven on the first floor gave off a lighter fluid smell for a week.
|
|
|
- put the new carpet down before the contractors had finished the other work
|
|
|
+ - carpet has visable seams
|
|
|
+ - carpet doesn't extent far enough under baseboards
|
|
|
|
|
|
## Billing
|
|
|
|