@@ -6,26 +6,8 @@
 
 ## Log
 
-- **25/09/02-04** - Painters ( interior )
-- **25/09/03** - plumbing ( downstairs )
-- **25/08/27-28** - Carpenter Dressing Room
-- **25/08/26** - Plumbing Hardware
-- **25/08/25** - Electrician
-- **25/08/15,18** - Plumbing/CPW - Tankless
-- **25/08/04-8** - Painters
-- **25/07/28-29** - Doors/Trim
-- **25/07/21-23** - Tile guys
-- **25/07/17** - Sliding Glass Door Installation
-- **25/07/15** - Insulation
-- **25/07/02** - Drywall
-- **25/06/30-7/1** - Electrical
-- **25/06/17-20** -  Plumbing
-- **25/07/10** - Electrician - adjust hall outlet
-- **25/07/07** - Drywall Mud ( 2 days ) / Adjust kneewall
-- **25/07/02** - Drywall up [๐Ÿ“ท](https://davidawindham.com/wha/glenridge/#bath)
-- **25/06/26** - Electrician/GC on site
-- **25/06/24** - Framer finishing out layout ( 1 day )
-- **25/06/17** - Plumbers on site reworking layout ( 3 days )
+main construction log is @ [/notes/house/helene](/notes/house/helene)
+
 - **25/06/11** - Demolition ( [photos](https://davidawindham.com/wha/glenridge/#bath) )
 - **25/06/03** - Quarle's / Snead's supply shopping - tile, carpet, and hardware
 - **25/06/02** - Demolition begun
@@ -36,8 +18,6 @@
 - **24/10/28** - timeline on this got bumped due to [helene repairs](/notes/house/helene). Contractor has given us a start date estimate of March 2025.
 
 
-## ToDo
-
 <div><br/><br/></div>
 ---
 

+ 57 - 0
notes/house/helene-issues.md

@@ -0,0 +1,57 @@
+---
+title: Issues
+image: https://davidawindham.com/wha/helene-1.jpg
+draft: true
+---
+
+# Issues
+
+We've had some hiccups along the way, so I just wanted to start list of issues we've had with the general contractor and sub contractors so they're not forgotten in case we need it.
+
+**Management**
+- General contractor has only been by the site once to check up on work - after the trusses were installed
+- Assistant to GC has only been by four times 
+  - got upset when we requested that a sub look at the broken sewer line
+- Not much supervision of subs
+- Communication lackluster
+  - quotes and invoicing incomplete
+  - requested payment before work was completed
+- Timeliness 
+  - slow pace - some contractors will work for just a couple of hours a day for a week.
+- Broken Sewer Line
+  - blowout line crushed by one of the haul off trucks or the lift equipment
+- Subcontractors
+  - contractor shit in our backyard - dog was eating something and noticed the roll of toilet paper
+  - contractors peeing in our driveway
+  - contractor puked in the yard because he came hungover
+  - left food trash in buckets upstairs that caused a bug infestation
+- had to drive over to GA to confirm quartz because couldn't get what was promised
+- 
+
+**Craftsmanship**
+
+- left a pile of debris in the yard for three months
+- left the old sliding door in the yard for two months
+- we personally hauled off several loads of trash
+- drywall not consistent or square in spots
+  - dropping drywall at hvac intake
+  - not square where the corners meet
+  - didn't use the waterproof type throughout the bathroom
+  - make patches where it should have been an entire board replaced
+- ripped out a closet that didn't need to be removed
+- threw away good materials and unnecessary demo
+- broke glass into the yard by tossing shower doors over the ledge
+- didn't plug the two HVAC vents that were ducted into the closed ceiling
+- didn't patch the ceiling until months after the trusses installed
+  - $600 heating cost to heat ceiling area
+- don't clean up after work
+  - sawdust in the drive
+  - trash in yard
+- broken hardware on bifold doors
+- paint on tile floor
+
+**Costs**
+
+- Requested payment before work was completed
+  - saying that y'all 'had a lot of money' out there
+- promissed to charge costs on materials

+ 68 - 44
notes/house/helene.md

@@ -11,45 +11,78 @@ image: https://davidawindham.com/wha/helene-1.jpg
 
 **24/10/05** - Hurricane Helene rolled through last week and did some damage mainly from the three and a half ton oak tree that fell on the house. I'm taking photos and making notes here to keep up with the details. I wrote up a post @ [/posts/hurricane-helene](/posts/hurricane-helene) and published additional damage and construction photos ๐Ÿ“ท @ [/wha/glenridge/#helene](https://davidawindham.com/wha/glenridge/#helene) 
 
+*This project spurred on two additional projects because we decided to renovate the bathroom in the process and we had to move my office for the work. We're using the same general contractor and I'm documenting them separately @ [/notes/house/bath](Bath) & [/notes/house/studio](/notes/house/studio)
 
 
+## ToDo
+
+- upper deck & railings
+- gutters replaced
+- chimney chaise windshield & caps
+- exterior Paint - touch up other tree damaged spots on chase siding
+- exterior paint - touch up after gutter replacement
+- issues @ [notes/house/helene/issues](notes/house/helene-issues.md)
+
 ## Log
 
-- main log @ [/notes/house/](/notes/house)
-- 3/25-26 - Ferqueron & Sons - remove two side pines and rear leaning oak ๐ŸŒณ
-  - grind two stumps and keep woodchips as mulch
-- 3/25 - WCTel on site to reroute fiber optic line
-- 3/19 - Mountz glass to measure rear, office, and sun room windows
-- 3/18 - GC meeting ( painter, carpet, doors, plumbing, tankless, gas line )
-- 3/10-19 - Framing crew - trusses installed / siding repaired
-- 3/10 - State Farm [Revised Claim Estimate](/notes/house/helene-ins-adjust.md) uploaded to claim portal
-- 3/05 - Ferqueron Dead Pine removed ( will come back for additional pines and oak near house )
-- 3/04 - State Farm sent [second inspector](/notes/house/helene-ins-adjust.md) to meet with general contractor
-- 2/29 - Lee [Ferqueron](http://www.ferqueronsons.com) to take out a pine and consult on other trees within house striking distance. 
-- 2/28 - got bathroom remodel specs @ [/notes/house/bath](/notes/house/bath)
-- 2/24 - general contractor ๐Ÿ”จ finally has us "on their schedule in a couple of weeks. Maybe the week of the 10th or the 17th" ( March ) - Downstairs cabinets will begin next week. 
-- 2/12 - Cabinet guy ( Kenny Talley ) over for measurements
-- 2/11 - Submitted general contractor repair ๐Ÿงพ estimate and tarp bill to State Farm claims portal
-- 2/06 - trusses delivered
-- 01/20 - added additional damage photos ๐Ÿ“ท @ [/wha/glenridge/#helene](https://davidawindham.com/wha/glenridge/#helene)
-- 12/06 - truss manufacturer backlogged 
-  - was told "12 weeks out"
-- 11/13 - Beth over for design measurements
-- 11/11 - subs over for measurements / estimates
-- 11/06 - ๐Ÿ”จ demo for truss measurements
-- 11/05 - State Farm claim estimate completed
-- 11/02 - Clear out master bed/bath & move downstairs 
-- 10/31 - Truss Engineers on site
-- 10/28 - General contractor on site
-- 10/28 - Insurance adjuster on site
-- 10/05 - Roof covered ๐Ÿš๏ธ
-- 10/04 - Trees ๐ŸŒณ removed from roof/yard
-- 10/03 - ๐Ÿ”‹ Power Restored 8pm ( 7 days )
-- 10/02 - Inspector safety/damage report ๐Ÿ“„
-- 09/29 - Roads cleared 
-- 09/28 - Debris cleared front/drive
-- 09/27 - Trees fell @ 6am
-- 09/27 - ๐Ÿชซ Power Out 5:30am 
+- **25/09/05** - Painters ( exterior )
+- **25/09/02-04** - Painters ( interior )
+- **25/09/03** - Plumbing ( downstairs fix )
+- **25/08/27-28** - Carpenter Dressing Room
+- **25/08/26** - Plumbing Tankless & Fix hot water issue
+- **25/08/25** - Electrician Crawlspace Tankless
+- **25/08/15,18** - Plumbing/CPW - Tankless
+- **25/08/04-8** - Painters
+- **25/07/28-29** - Doors/Trim
+- **25/07/21-23** - Tile Bathroom
+- **24/07/17** - Sliding Door Installation & drywall finishing
+- **24/07/14-15** - [Master](/notes/house/bath) drywall & insulation
+- **24/07/10-11** - [Exterior](/notes/house/helene) exterior paint
+- **25/07/10** - Electrician - adjust hall outlet
+- **25/07/07** - Drywall Mud ( 2 days ) / Adjust kneewall
+- **24/07/02** - [Master](/notes/house/bath) drywall up [๐Ÿ“ท](https://davidawindham.com/wha/glenridge/#bath)
+- **25/06/30-7/1** - [Master](/notes/house/bath) electrical
+- **25/06/26** - Electrician/GC on site
+- **25/06/17-20** - [Master](/notes/house/bath) plumbing
+- **25/06/03** - Quarle's / Snead's supply shopping - tile, carpet, and hardware
+- **25/06/02** - [Master](/notes/house/bath) Demo ( 4.5 days 2,3,4,10,11 )
+- **25/04/16** - Gas lines installed
+- **25/04/10** - Roof replaced - 7am -> 6pm - finished 
+- **25/04/02** - windows replaced (+ sunroom/office)
+- **25/03/26** - CPW marked utility lines for gas 
+- **25/03/03-6** - [Studio](/notes/house/studio.md) cabinets installed
+- **25/03/5-6** - Ferqueron & Sons - remove two side pines and rear leaning oak ๐ŸŒณ grind two stumps and keep woodchips as mulch
+- **25/03/25** - WCTel on site to reroute fiber optic line
+- **25/03/19** - Mountz glass to measure rear, office, and sun room windows
+- **25/03/18** - GC meeting ( painter, carpet, doors, plumbing, tankless, gas line )
+- **25/03/10-19** - Framing crew - trusses installed / siding repaired
+- **25/03/10** - State Farm [Revised Claim Estimate](/notes/house/helene-ins-adjust.md) uploaded to claim portal
+- **25/03/05** - Ferqueron Dead Pine removed ( will come back for additional pines and oak near house )
+- **25/03/04** - State Farm sent [second inspector](/notes/house/helene-ins-adjust.md) to meet with general contractor
+- **25/02/29** - Lee [Ferqueron](http://www.ferqueronsons.com) to take out a pine and consult on other trees within house striking distance. 
+- **25/02/28** - got bathroom remodel specs @ [/notes/house/bath](/notes/house/bath)
+- **25/02/28** - contractor has us on the schedule starting in a couple weeks. Got at final mockup of the remodel. 
+- **25/02/24** - general contractor ๐Ÿ”จ finally has us "on their schedule in a couple of weeks. Maybe the week of the 10th or the 17th" ( March ) - Downstairs cabinets will begin next week. 
+- **25/02/12** - Cabinet guy ( Kenny Talley ) over for measurements
+- **25/02/11** - Submitted general contractor repair ๐Ÿงพ estimate and tarp bill to State Farm claims portal
+- **25/02/06** - trusses delivered
+- **25/01/20** - added additional damage photos ๐Ÿ“ท @ [/wha/glenridge/#helene](https://davidawindham.com/wha/glenridge/#helene)
+- **24/12/06** - truss manufacturer backlogged - was told "12 weeks out"
+- **24/11/13** - Beth over for design measurements
+- **24/11/11** - subs over for measurements / estimates
+- **24/11/06** - ๐Ÿ”จ demo for truss measurements
+- **24/11/05** - State Farm claim estimate completed
+- **24/11/02** - Clear out master bed/bath & move downstairs 
+- **24/10/31** - Truss Engineers on site
+- **24/10/28** - General contractor and Insurance Adjuster meeting on site
+- **24/10/05** - Roof covered ๐Ÿš๏ธ
+- **24/10/04** - Trees ๐ŸŒณ removed from roof/yard
+- **24/10/03** - ๐Ÿ”‹ Power Restored 8pm ( 7 days )
+- **24/10/02** - Inspector safety/damage report ๐Ÿ“„
+- **24/09/29** - Roads cleared 
+- **24/09/28** - Debris cleared front/drive
+- **24/09/27** - Trees fell @ 6am
+- **24/09/27** - ๐Ÿชซ Power Out 5:30am 
 
 ## Damages
 
@@ -160,15 +193,6 @@ Met with an assortment of contractors and got third party reviews from others be
 - Carpet - StainMaster Signature Unmatched Super Fine open loop 
   - StainMaster padding/underlay
 
-### Punch Lists
-
-#### Exterior
-
-- Gutters - replace
-- Chimney Chase Windshield / Caps
-- Exterior Paint ( touch up spots on chase / ladders )
-
-#### Interior
 
 ## Landscape
 

+ 3 - 19
notes/house/house.md

@@ -12,25 +12,9 @@
 
 ## Log
 
-- 24/7/17 - Sliding Door Installation & drywall finishing
-- 24/7/14-15 - [**Master**](/notes/house/bath) drywall & insulation
-- 24/7/10-11 - [**Exterior**](/notes/house/helene) exterior paint
-- 24/7/02 - [**Master**](/notes/house/bath) drywall
-- 25/6/30-7/1 - [**Master**](/notes/house/bath) electrical
-- 25/6/17-20 - [**Master**](/notes/house/bath) plumbing
-- 25/6/02 - [**Master**](/notes/house/bath) Demo ( 4.5 days 2,3,4,10,11 )
-- 25/4/16 - **Gas** lines installed
-- 25/4/10 - **Roof** replaced - 7am -> 6pm - finished 
-- 25/4/02 - **windows** replaced (+ sunroom/office)
-- 25/3/26 - CPW marked utility lines for gas 
-- 25/3/36 - [**Studio**](/notes/house/studio.md) cabinets installed
-- 25/3/25-26 - Ferqueron & Sons - remove two side pines and rear leaning oak ๐ŸŒณ
-  - grind two stumps and keep woodchips as mulch
-- 25/3/25 - WCTel on site to reroute fiber optic line
-- 25/3/19 - Mountz glass to measure rear, office, and sun room windows
-- 25/3/18 - GC meeting ( painter, carpet, doors, plumbing, tankless, gas line )
-- 25/3/10-19 - Framing crew - trusses installed / siding repaired
-- 25/03/13 - [trusses installed](/notes/house/helene)
+- 25/??/?? - [Master Bath](/notes/house/bath) Complete
+- 25/??/?? - [Helene Repairs](/notes/house/helene) Complete
+- 25/04/10 - [New Roof and trusses](/notes/house/helene)
 - 25/03/05 - second [insurance adjuster](/notes/house/helene-ins-adjust.md) met with general contractor
 - 24/12/10 - added Helene [Insurance Claim](/notes/house/helene-ins-adjust.md)
 - 24/11/02 - [remodel master bath](/notes/house/bath) and [move office](/notes/house/studio)  alongside helene repairs.