--- title: Renovation Costs image: https://davidawindham.com/wha/helene-1.jpg hide_table_of_contents: true --- :::warning[Private Page] ::: These are the cost related to the hurrican helene [repairs](/notes/house/helene) and post helene renovations on the [studio](/notes/house/studio), master, and [bath](/notes/house/bath). Here are links to the .pdfs for the original [Estimates](/pdf/KLTimmerman-Estimates.pdf) and [Invoices](/pdf/KLTimmerman-Invoices.pdf). I'm using this page to share some questions and comments with the contractor and the boss. We've also started a document for the remaining quality control [issues](/notes/house/kl-timmerman-issues). ## KL Timmerman Enterprises, LLC ### Invoice(s) # 35435 / # 35457 / # 35663 / # 35701 ||Downstairs Office - Invoice # 35435||| |---|---|---|---| |1. Fabricate and install lower cabinets with pull out shelving for printer.|||| ||- The center will be desk area.||| ||- Fabricate bookcases to set on top of the counter top.||| ||* Height to be about 29 1/4". With counter top the overall height will be around 30".||| ||* Alder wood will be used.||| ||Labor and materials |$8,200.00|| |2. Install smooth black Formica countertop the width of the room.|||| ||* The counter top will have 1 seam due to the length.||| ||Labor and materials |$1,000.00|| |3. Install an outlet for the printer.|||| ||- Install 1 quad outlet.||| ||- Install TV outlet.||| ||* Use existing circuit.||| ||Labor and materials |$937.00|👈🏻 an outlet?| ||||| ||TOTAL|$10,137.00|| |||||


||Roof / Siding - Invoice # 35457||| |---|---|---|---| |1. Roof trusses. ||$1,983.80|| |2. Remove existing roof shingles, roof sheeting, overhang soffit, and trim in area of repair at upper bedroom of home.||$17,339.83|| ||- Remove four damaged 2x4 trusses.||| ||- Replace damaged trusses.||| ||- Install new 1/2" OSB plywood using clips in area of repair only.||| ||- Remove existing 1/2" rough sawn plywood siding with 1x8 cedar trim boards at rear wall of bedroom including damaged area on side wall.||| ||- Install new brick mould trim to one window unit at rear of bedroom wall.||| ||- Install new siding and soffit trim to area of repair as to match existing as close as possible.||| |3. Remove existing shingles and haul away all job related debris. ||$20,522.04|| ||- Install Atlas 35 year architectural shingles to entire roof system.||| ||- Install synthetic underlayment barrier to entire roof system.||| ||- Install shingle over ridge vent to gable ridge of home.||| ||- Replace all vent pipe collar boots and install new flashing at any chimneys's.||| |4. Hang sheetrock on ceiling at upstairs bedroom and repair closet ceiling and wall.|||| ||- Apply texture at repair area.||| |5. Caulk, prime, and putty one new side and touch up handrails.|||| ||- Caulk, prime, and putty soffit on both sides and siding as needed.||| ||- Paint inside bedroom, bath, and closet ceiling, trim, and walls. Exterior $4860.00 - Interior $3071.25||| |6. Install approximately 114 lf og Alcoa 6" seamless aluminum guttering to the home.|||| ||- Install approximately 75lf of commercial 3 x 4 downspout to gutter system.||| |7. Install Sureflow 6" leaf protection to new guttering on the home.|||| |8. Rental fee for telehandler to set roof truss and make exterior repairs. ||$3,111.45|| |9. Furnished and installed two 5/8" clear tempered IG units. ||$1,136.00|👈🏻⁉️ duplicated on addendum| |10. Remove existing sliding patio door unit from rear upper level of home.|||| ||- Haul away job related debris.||| ||- Install one Weathershield Signature Series sliding patio door unit with painted aluminum clad trim.||| ||- Interior of door unit will be unfinished wood.||| ||- Door unit will come with Low-E performance glass units.||| ||- Door unit will have a standard 2 point lock system with keyed lock.||| |11. Replace interior and window and door casing.|||| |12. Cut out ceiling in the bedroom to assess damage and hauled off debris. ||$540.11|| |13. Install padding and carpet.|||| |14. Blown-in insulation in master bedroom ceiling.|||| |15. Duct work repair/replacement. * TO BE FORTHCOING|||| |16. Install ceiling fan in the master bedroom - labor only|||| ||- Remove and reset the exterior light fixture by the sliding glass patio door.||| ||||| ||TOTAL|$44,633.23|✅| |||||


||Master Suite Remodel - Invoice # 35663||| |---|---|---|---| |DEMO AND ROUGH-IN CARPENTRY|||| |1. Demo walls associated with remodel.|||| ||- Remove both shower units, vanities/tops, and plumbing fixtures.|| ||- Take up existing floor tile and subfloor to access plumbing.||| ||Labor - range between $5000.00 - $6500.00|$5,239.44|| ||Disposal fee at landfill allowance |$0.00|| |2. Cut and install new subfloor.|Labor |$1,363.00|| ||Materials |$416.60|| |3. Frame new walls, install supports in shower, frame custom niche in shower.|Labor|$1,785.00|| ||Materials|$381.94|| |PLUMBING|||| |1. Cap lines for demo.|- Re-route water (will use Pex pipe) and drain lines for plumbing fixture locations.||| ||- Re-route vent through the roof.||| ||Labor and plumbing materials |$5,625.00|| |2. Install new plumbing valves and fixtures.|Labor|$3750.00|| |3. Install a gas tankless water heater| Labor, water heater, and plumbing materials|$3750.00|| |Fixtures|||| |1. Quarles quote||$3607.29|| |2. Toilet from Quarles||$306.79|| |3. Moen rough-in valve for shower ||$194.41|| |4. Toilet - American Standard Aspirations 252AA899.020 * with tax ||$1,781.55|👈🏻 $450 from Home Depot?| |ELECTRICAL|||| |Bathroom 1. Demo existing as needed.|- Install customer provided heater/fan combo outside shower area and switched on door wall opposite of shower.||| ||- Install an outlet on the bathroom entry door wall opposite of shower.||| ||- Install 3 wafer lights on a dimmer switch - 3 way - switch to be located on bathroom entry door wall opposite of shower and on the left end wall of vanity. * Only installed 2 wafers, added 2 retrofit can trims for stairwell.| ||- Install 2 vanity lights - switch to be located on left end wall of vanity.||| ||- Install 2 GFI's - to be located on left and right walls of vanity.||| |Master bedroom |||| |1. Install new ceiling fan - switch to be located on left wall entering the bedroom.|- Switch the 2 existing outlets on long wall of bedroom for lamps - switch to be located of left wall entering the bedroom.||| ||Labor and materials |$5,225.00|👈🏻| ||Panasonic Whisper Coy heater/van 811A * Customer provided||| ||2 vanity lights |$503.05|| ||CREDIT FOR INSTALLATION OF CEILING FAN FROM INSURANCE. |-$250.00|| |DRYWALL||| ||1. Make repairs to drywall from demo.||| ||2. Install drywall on walls and ceiling associated with master bathroom and bedroom remodel.||| ||Labor and materials |$4,620.00|| |TRIM AND DOORS |||| |1. Install baseboard in the bedroom, bathroom, hallway, and Ginny's closet - all associated with remodel.|- Install bi-hinge bedroom doors and casing - 6 panel raised solid core. INSTALLED BIFOLD||| ||- Install bi-hinge closet doors and casing - 6 panel raised solid core. INSTALLED BI-FOLD||| ||- Install 2 door units for bathroom and casing - 6 panel raised solid core. DID NOT DO||| ||Labor |$2,200.00|| ||Trim |$453.65|| ||Allowance - Door units, bi-hinge doors, hinges, ball catches, and door handles. |$983.75|| ||* Door allowance etc was 1200.00. Actual cost was 1585.91. Giving credit for the 2 bathroom doors 361.66. Giving credit for 1/2 of the bi-fold closet door - agreed on bi-hinge and we threw away the existing bi-fold - bought new bi-fold doors at 481.00 - will split this and gave credit for 240.50||| |PAINTING|||| |1. Paint all ceilings, walls, and trim associated with master bedroom and bathroom remodel.|Labor and materials|$3,125.00|| ||-Stairwell long wall, short wall at end of landing, trim, and the ceiling - $1,312.50||| ||- One wall, trim, and door in Ginny's closet - $593.75 * No extra charge for painting complete closet.||| ||- Bathroom walls, ceiling, trim, and door - $1,218.75||| |MISCELLANEOUS|||| |1. Shower and bathroom floor tile|Labor |$5,625.00|| ||Tile allowance for shower walls, shower floor, and outside floor * Tile cost for shower and outside floor was 3660.58|$3,660.58|| ||Freight allowance |$300.00|| ||Materials - grout, caulk, schluter, backerboard, schluter Kerdi shower tray, etc. This is included in the 3660.58 amount||| |2. Bedroom padding and carpet|Labor|$1,050.00|| ||- Carpet allowance and pad together was 4291.24 |$4,291.24|| ||#10 pad and seam tape||| ||CREDIT FROM INSURANCE ON 216 s ft ALLOWANCE FOR INSURANCE.|-$1391.04|| |3. Vanity|- Custom build and install vanity.||| ||Allowance |$8800.00|| ||Allowance for knobs/pulls||| |4. Vanity top and sinks|- Template and install||| ||Allowance for top and sinks Actual cost |$3,833.40|| |5. Shower door TO BE ON FINAL DRAW|- Custom shower door and installation allowance. |$3000.00|| |6. Mirror - remove existing mirror and reinstall.||$250.00|👈🏻⁉️ duplicate| |7. Install bathroom accessories|Grab bar 50.00 each * WILL BE ON FINAL INOICE|$0.00|| ||Towel bars, robe hooks, toilet paper holder, and 2 hand towel rings.|$125.00|| ||Allowance on accessories * Cost of accessories including closet pulls |$388.64|| |8. Allowance on custom linen closet. ||$2,500.00|| |EXTRAS - ALL AT COST|||| ||Permit fee paid |$110.00|| ||Extra insulation |$800.00|| ||Extra quad outlets and light and switch in the crawlspace|$645.00|| ||Closet labor |$1550.00|| ||Closet materials |$739.80|| ||Painting closet and drawer fronts |$680.00|| ||Installed outside light fixture |$80.00|| ||Installed uarter round in carpeted rooms|$200.00|| ||Quarter round|$61.63|| |9. Hung sheetrock on ceiling at upstairs bedroom and repaired closet ceiling and wall. |- Applied texture at repair area.|$2835.00|👈🏻| |10. Caulked, primed, and puttied one new side and touched up handrails.||$7331.25|👈🏻⁉️| |11. Blown in insulation in master bedroom ceiling. |* This was considerably less.|$480.00|| ||||| ||TOTAL|$93,006.97|| |||||


||Addendum - Invoice # 35701||| |---|---|---|---| |Extra Items Requested|||| |1. Installed 2 chimney caps and a custom fabricated border shade. ||$874.70|| |2. Replaced gutters around remainder of home. ||$2,978.08|| |3. Installed leaf protection. ||$1794.90|| |4. Master bedroom - replaced 2 clear IG units. ||$1,336.00|👈🏻⁉️ duplicate| ||||| |REGARDING INVOICE #35663|||| |1. Page 4 - Item # 5 - Shower door was invoiced at $3000.00 - Actual cost was $2918.00|- Labor and materials to install custom door. |-$82.00|| |2. Page 4 - Item #6 - Mirror - *|- cut existing mirror and installed |$190.00|👈🏻⁉️ duplicate| |3. Page 5 - Item #7 - install bathroom accessories|- Installed grab bar |$50.00|| ||||| |Remaining items from the Insurance estimate that have not been invoiced.|||| |1. Removed existing sliding patio door unit from rear upper level.|- Installed Weathersheild unit.||| ||Labor |$3,347.50|| ||Door unit |$3,914.62|| ||||| |2. Installed 114 lf of Alcoa 6" seamless gutter.|||| ||Labor and materials |$2,689.60|| |3. Install Sureflow 6" leaf protection.|||| ||Labor and materials |$1,635.55|| |4. Repaired/replace duct wor and connected at drops.|||| ||Labor and materials |$1,050.00|| ||||| ||TOTAL|$19,778.95|| ||||| ||||| ||GRAND TOTAL|$167,556.15||