--- title: Renovation Issues image: https://davidawindham.com/wha/helene-1.jpg hide_table_of_contents: true draft: true --- :::warning[Private Page] ::: These are our notes related to the hurrican helene [repairs](/notes/house/helene) and post helene renovations on the [studio](/notes/house/studio), master, and [bath](/notes/house/bath). I'm using this page to share some questions and comments with the contractor and the boss. We've also started a document for the contractor [costs](/notes/house/kl-timmerman-costs). ## KL Timmerman Enterprises, LLC ## Quality Control Issues We've had some hiccups along the way, so I just wanted to start list of issues we've had with the general contractor and sub contractors so they're not forgotten if we need to reference them. ## Punch List **Exterior** - rear upper deck & railings - ~~deck light~~ - ~~chimney seal, cap, & wrap~~ - caps on doubled 2x12s - was told they would be caulked to look like 4x12s - insulation and pipes in crawlspace - gap sealant on gas exhaust - proper drainage valves on hot water heater? - gutters left metal intact from previous gutters - leaving visible gaps under the shingles that are large enough that small critters could enter the attic. - ~~missing downspouts on gutters~~ - ~~hole in gutter to right of entrance~~ - water dripping along wood under upper gutter. - ~~leaking downspout connector entrance~~ - painting in spots - siding - paint spills on porch, side of house, and upper deck - front doors - were measured but not follow up - ~~haul off~~ - ~~truss & doors~~ - ~~ladder from painters~~ - replace 3 gallons of exterior paint 👈🏻 **Interior** - bathroom hardware - ~~shower handrails~~ - ~~hvac ductwork~~ - ~~broken shower wand tube~~ - ~~bad water pressure~~ - ~~remove water restrictors?~~ - check sewer leak? - had failed to clean out heads on faucets. - bathtub not properly installed 👈🏻 - slides around - no blocking as specified in manual - no additional 2x12s as specified in manual - no backsplash or water proofing on the wall of bathtub 👈🏻 - white caulk on bathtub filler - sliding door not caulked - sliding poor trim paint/stain - ~~ceiling fan~~ - paint on tile floor - ~~no backing support for grab bars behind tile~~ - ~~broken grab bar install~~ - damaged bi-fold doors - broken hardware on bifold doors - split wood on the base of closet doors - door hardware for bedroom - cracked floor trim from carpet puller - ~~closet shelves needs to be split for attic~~ - didn't closet shelves - ~~carpet doesn't meet baseboards~~ - carpet transition to tile 👈🏻 - ~~feel tacks on bare feet~~ - dressing room - drawers/hardware - stained seat top - lighting? extra switch? 👈🏻 - ~~bathroom switches upside down~~ - ~~stairway light switch~~ - lots of questionable drywall/paint work 👈🏻 - crooked wall in bedroom corner - tape marks in ceiling - wavy at bed entrance - too many repair pieces - splotchy above bed - spots on bathroom ceiling - downstairs ceiling repair from two separate leaks and jackhammer cracking 👈🏻 - downstairs bathroom paint 👈🏻 - stairwell trim paint baseboards **Minor** - window treatments - tub / vertical blinds - remove curtain rod ## Management - Timeliness - slow pace - some contractors will work for just a couple of hours a day for a week. - took **over a year** to complete the project or **9 months** if you account for the truss manufacturing delay - very little inspection of work - **NO** final inspection - General contractor has only been by the site twice to check up on work - after the trusses were installed and after the the paint - Assistant to GC not on site often - once on an emergency call after a leak - Not much supervision of subs - Communication lackluster - Inconsistent notice of subcontractors arriving onsite - sometimes no notice and sometimes just 15 minute notice - Broken Sewer Line - blowout line crushed by one of the haul off trucks or the lift equipment - Subcontractors - contractor 💩 in our backyard - dog was eating something and noticed the roll of toilet paper - contractors peeing in our driveway - contractor puked in the yard because he came hungover - left food trash in buckets upstairs that caused am indoor bug infestation - dumped rotten food in bushes - paint in bushes and on house in cleaning - had to drive over to GA to confirm quartz because couldn't get what was promised - didn't fix cut drywall in downstairs bathroom for three months - left it open and we taped the piece back into it - still not painted - contractors on site past normal working hours - contractor fishing in pond putting fish in bucket ## Craftsmanship - studio left without hardware for three months - leaking seal on pipe that ran into the wall and stained the ceiling on the floor below in both the den and downstairs bathroom - hot water install mixed with cold water - we didn't have cold water for a couple of days - covered existing electrical outlets - didn't seal off area of drywall sanding - no ventilation or air treatment - didn't replace hvac intakes - installed tile inset the wrong direction - left hvac ducts unpatched for months. I finally patched them. - poured water under the house instead of piping it out - left a pile of debris in the yard for three months - left the old sliding door in the yard for a month - we personally hauled off several loads of trash - popcorn ceiling has visible seams - drywall not consistent or square in spots - dropping drywall at hvac intake - not square where the corners meet - didn't use the waterproof type throughout the bathroom - made patches where it should have been an entire board replaced - ripped out a closet that didn't need to be removed - threw away good materials and unnecessary demo - duct vents, bi-fold doors - broke glass into the yard by tossing shower doors over the ledge - didn't plug the two HVAC vents that were ducted into the closed ceiling - found a previously split truss just one truss back from what was installed - didn't mention it to us - left the extra truss in our yard for nine months - didn't patch the ceiling until months after the trusses installed - $600 heating cost to heat ceiling area - didn't tile all the way to the ceiling in shower as requested - don't clean up after work - trash/food in yard, nails/metal in bushes - paint on window hardware - paint on tile floor - paint spills on front porch - had to repaint and drywall because of poor work - didn't install backing support for grab bar - spilled a heavy amount of paint thinner into the subfloor which then permeated the house for a week causing headaches and eye irritation. So potent that any heating element like our oven on the first floor gave off a lighter fluid smell for a week. - put the new carpet down before the contractors had finished the other work - carpet has visable seams - carpet doesn't extent far enough under baseboards ## Billing - quotes and invoicing inconsistent. - Showed up on site requesting payment before work was completed or inspected - No discussion of invoicing changes - Invoicing duplicate errors - aggressive labor charges