## Insurance Claim Totals
| **Summary** |
**Time & Materials** |
| Line Item Total |
12,589.48 |
Material |
2,960.98 |
| Tax |
207.27 |
Labor |
9,804.46 |
| Subtotal |
12,796.75 |
Equipment |
1,200.15 |
| Laundry & D/C Tax |
0.58 |
Miscellaneous |
8.25 |
| **RCV** Replacement Cost Value |
12,797.33 |
Subtotal |
13,973.84 |
| Less Depreciation (Including Taxes) |
(2,044.36) |
Material Sales Tax |
207.27 |
| Less Deductible |
(2,620.64) |
Laundry & D/C Tax |
0.58 |
| **Net** Actual Cash Value Payment |
**$8,132.33** |
Total **ACV** Actual Cost Value |
**14,181.69** |
## Insurance Reimbursement vs. Contractor Costs
### Tree Removal
| **Insurance** |
**Contractor** |
| Tree Removal - |
| Tree - removal and disposal |
|
|
Materials |
2,239.44 |
|
Materials |
|
|
Labor |
1,165.92 |
|
Labor |
|
| Line Items 39-40 |
|
**3,405.36** |
JMP Construction |
|
**6750.00** |
|
Difference: |
**3344.64** |
### Landscaping
| **Insurance** |
**Contractor** |
| Landscaping - |
| **note:** 20,000 coverage in our policy but nothing in claim settlement. Lost a lot of turf and shrubbery. Some of it due to heavy equipment ( not sure if covered ) Will replant & re-sod/seed. |
|
|
|
Materials |
|
|
Materials |
|
|
Labor |
|
|
Labor |
|
| Line Items - |
|
**0.00** |
Contractor(s) |
|
|
### Demolition
| **Insurance** |
**Contractor** |
| Demolition - |
|
|
|
Materials |
|
|
Materials |
|
|
Labor |
|
|
Labor |
|
| Line Items - |
|
|
Contractor(s) |
|
|
### Roof
| **Insurance** |
**Contractor** |
| Roof - |
| **note:** contractor noted that he saw nothing in the settlement regarding engineered trusses 🛑 and pointed out the both sides of the top roof will need to be replaced. Will be writing up quote. |
|
|
|
Materials |
493.54 |
|
Materials |
|
|
Labor |
4,259.46 |
|
Labor |
|
| Line Items 1-4 |
|
**4,753.00** |
Contractor(s) |
|
|
### Insulation
| **Insurance** |
**Contractor** |
| Insulation - |
|
|
|
Materials |
|
|
Materials |
|
|
Labor |
|
|
Labor |
|
| Line Items - |
|
|
Contractor(s) |
|
|
### Siding
| **Insurance** |
**Contractor** |
| Siding- |
| **note:** cedar siding - about 40-60ft needs to be replaced |
|
|
|
Materials |
1.20 🛑 |
|
Materials |
|
|
Labor |
204.50 |
|
Labor |
|
| Line Items - |
|
|
Contractor(s) |
|
|
### Soffit, Fascia, & Gutter
| **Insurance** |
**Contractor** |
| Soffit, Fascia, & Gutter - |
|
|
|
Materials |
|
|
Materials |
|
|
Labor |
|
|
Labor |
|
| Line Items - |
|
|
Contractor(s) |
|
|
### Windows
| **Insurance** |
**Contractor** |
| Windows - |
|
|
|
Materials |
|
|
Materials |
|
|
Labor |
|
|
Labor |
|
| Line Items - |
|
|
Contractor(s) |
|
|
### Doors
| **Insurance** |
**Contractor** |
| Doors - |
|
|
|
Materials |
|
|
Materials |
|
|
Labor |
|
|
Labor |
|
| Line Items - |
|
|
Contractor(s) |
|
|
### Drywall
| **Insurance** |
**Contractor** |
| Drywall - |
|
|
|
Materials |
|
|
Materials |
|
|
Labor |
|
|
Labor |
|
| Line Items - |
|
|
Contractor(s) |
|
|
### Paint
| **Insurance** |
**Contractor** |
| Paint - |
|
|
|
Materials |
|
|
Materials |
|
|
Labor |
|
|
Labor |
|
| Line Items - |
|
|
Contractor(s) |
|
|
### Flooring
| **Insurance** |
**Contractor** |
| Flooring - |
| **note:** there is water damage to the subflooring beneath the carpet that the adjuster didn't note or look for. Also will need to redo the entire carpet upstairs to match. |
|
|
|
Materials |
|
|
Materials |
|
|
Labor |
|
|
Labor |
|
| Line Items - |
|
|
Contractor(s) |
|
|