description: Insurance claim related to Hurrican Helene Damage
hide_table_of_contents: false
---
# Insurance Summary
:::info
24/12/09 - I compiled a simpler version from our insurance company's [Claims Summary Report](/notes/house/helene-ins-adjust) so that we could more easily compare them item to item with our contractor's estimates & invoices.
:::
## Insurance Claim Totals
**Summary** |
**Time & Materials** |
Line Item Total |
12,589.48 |
Material |
2,960.98 |
Tax |
207.27 |
Labor |
9,804.46 |
Subtotal |
12,796.75 |
Equipment |
1,200.15 |
Laundry & D/C Tax |
0.58 |
Miscellaneous |
8.25 |
**RCV** Replacement Cost Value |
12,797.33 |
Subtotal |
13,973.84 |
Less Depreciation (Including Taxes) |
(2,044.36) |
Material Sales Tax |
207.27 |
Less Deductible |
(2,620.64) |
Laundry & D/C Tax |
0.58 |
**Net** Actual Cash Value Payment |
**$8,132.33** |
Total **ACV** Actual Cost Value |
**14,181.69** |
## Insurance Reimbursement vs. Contractor Costs
### Tree Removal
**Insurance** |
**Contractor** |
Tree Removal - |
Tree - removal and disposal |
|
|
Materials |
2,239.44 |
|
Materials |
|
|
Labor |
1,165.92 |
|
Labor |
|
Line Items 39-40 |
|
**3,405.36** |
JMP Construction |
|
**6750.00** |
|
Difference: |
**3344.64** |
### Landscaping
**Insurance** |
**Contractor** |
Landscaping - |
**note:** 20,000 coverage in our policy but nothing in claim settlement. Lost a lot of turf and shrubbery. Some of it due to heavy equipment ( not sure if covered ) Will replant & re-sod/seed. |
|
|
|
Materials |
|
|
Materials |
|
|
Labor |
|
|
Labor |
|
Line Items - |
|
**0.00** |
Contractor(s) |
|
|
### Demolition
**Insurance** |
**Contractor** |
Demolition - |
|
|
|
Materials |
|
|
Materials |
|
|
Labor |
|
|
Labor |
|
Line Items - |
|
|
Contractor(s) |
|
|
### Roof
**Insurance** |
**Contractor** |
Roof - |
**note:** contractor noted that he saw nothing in the settlement regarding engineered trusses 🛑 and pointed out the both sides of the top roof will need to be replaced. Will be writing up quote. |
|
|
|
Materials |
493.54 |
|
Materials |
|
|
Labor |
4,259.46 |
|
Labor |
|
Line Items 1-4 |
|
**4,753.00** |
Contractor(s) |
|
|
### Insulation
**Insurance** |
**Contractor** |
Insulation - |
|
|
|
Materials |
|
|
Materials |
|
|
Labor |
|
|
Labor |
|
Line Items - |
|
|
Contractor(s) |
|
|
### Siding
**Insurance** |
**Contractor** |
Siding- |
**note:** cedar siding - about 40-60ft needs to be replaced |
|
|
|
Materials |
1.20 🛑 |
|
Materials |
|
|
Labor |
204.50 |
|
Labor |
|
Line Items - |
|
|
Contractor(s) |
|
|
### Soffit, Fascia, & Gutter
**Insurance** |
**Contractor** |
Soffit, Fascia, & Gutter - |
|
|
|
Materials |
|
|
Materials |
|
|
Labor |
|
|
Labor |
|
Line Items - |
|
|
Contractor(s) |
|
|
### Windows
**Insurance** |
**Contractor** |
Windows - |
|
|
|
Materials |
|
|
Materials |
|
|
Labor |
|
|
Labor |
|
Line Items - |
|
|
Contractor(s) |
|
|
### Doors
**Insurance** |
**Contractor** |
Doors - |
|
|
|
Materials |
|
|
Materials |
|
|
Labor |
|
|
Labor |
|
Line Items - |
|
|
Contractor(s) |
|
|
### Drywall
**Insurance** |
**Contractor** |
Drywall - |
|
|
|
Materials |
|
|
Materials |
|
|
Labor |
|
|
Labor |
|
Line Items - |
|
|
Contractor(s) |
|
|
### Paint
**Insurance** |
**Contractor** |
Paint - |
|
|
|
Materials |
|
|
Materials |
|
|
Labor |
|
|
Labor |
|
Line Items - |
|
|
Contractor(s) |
|
|
### Flooring
**Insurance** |
**Contractor** |
Flooring - |
**note:** there is water damage to the subflooring beneath the carpet that the adjuster didn't note or look for. Also will need to redo the entire carpet upstairs to match. |
|
|
|
Materials |
|
|
Materials |
|
|
Labor |
|
|
Labor |
|
Line Items - |
|
|
Contractor(s) |
|
|