notes/house/kl-timmerman-costs.md

@@ -18,7 +18,7 @@ I'm using this page to share some questions and comments with the contractor and
 | [costs](/notes/house/kl-timmerman-costs)
 | [costs](/notes/house/kl-timmerman-costs)
 | [estimates](/pdf/KLTimmerman-Estimates.pdf)
 | [estimates](/pdf/KLTimmerman-Estimates.pdf)
 | [invoices](/pdf/KLTimmerman-Invoices.pdf)
 | [invoices](/pdf/KLTimmerman-Invoices.pdf)
-| [issues](/notes/house/)
+| [notes](/notes/house/kl-timmerman-issues)
 
 
 ### Invoice(s)  # 35435 / # 35457 / # 35663 / # 35701
 ### Invoice(s)  # 35435 / # 35457 / # 35663 / # 35701
 
 
@@ -83,7 +83,8 @@ I'm using this page to share some questions and comments with the contractor and
 |16.  Install ceiling fan in the master bedroom - labor only||||
 |16.  Install ceiling fan in the master bedroom - labor only||||
 ||- Remove and reset the exterior light fixture by the sliding glass patio door.|||
 ||- Remove and reset the exterior light fixture by the sliding glass patio door.|||
 |||||
 |||||
-||TOTAL|$44,633.23|โœ…|
+||<b>TOTAL</b>|<b>$44,633.23</b>||
+||BALANCE|$0|โœ… Paid|
 |||||
 |||||
 
 
 <div><br/><br/></div>
 <div><br/><br/></div>
@@ -110,7 +111,7 @@ I'm using this page to share some questions and comments with the contractor and
 |1. Quarles quote||$3607.29||
 |1. Quarles quote||$3607.29||
 |2. Toilet from Quarles||$306.79||
 |2. Toilet from Quarles||$306.79||
 |3. Moen rough-in valve for shower ||$194.41||
 |3. Moen rough-in valve for shower ||$194.41||
-|4. Toilet - American Standard Aspirations 252AA899.020 * with tax ||$1,781.55|๐Ÿ‘ˆ๐Ÿป $450 from Home Depot?|
+|4. Toilet - American Standard Aspirations 252AA899.020 * with tax ||$1,781.55|๐Ÿ‘ˆ๐Ÿปโ‰๏ธ $450 from Home Depot?|
 |ELECTRICAL||||
 |ELECTRICAL||||
 |Bathroom 1. Demo existing as needed.|- Install customer provided heater/fan combo outside shower area and switched on door wall opposite of shower.|||
 |Bathroom 1. Demo existing as needed.|- Install customer provided heater/fan combo outside shower area and switched on door wall opposite of shower.|||
 ||- Install an outlet on the bathroom entry door wall opposite of shower.|||
 ||- Install an outlet on the bathroom entry door wall opposite of shower.|||
@@ -119,7 +120,7 @@ I'm using this page to share some questions and comments with the contractor and
 ||- Install 2 GFI's - to be located on left and right walls of vanity.|||
 ||- Install 2 GFI's - to be located on left and right walls of vanity.|||
 |Master bedroom ||||
 |Master bedroom ||||
 |1. Install new ceiling fan - switch to be located on left wall entering the bedroom.|- Switch the 2 existing outlets on long wall of bedroom for lamps - switch to be located of left wall entering the bedroom.|||
 |1. Install new ceiling fan - switch to be located on left wall entering the bedroom.|- Switch the 2 existing outlets on long wall of bedroom for lamps - switch to be located of left wall entering the bedroom.|||
-||Labor and materials |$5,225.00|๐Ÿ‘ˆ๐Ÿป|
+||Labor and materials |$5,225.00||
 ||Panasonic Whisper Coy heater/van 811A * Customer provided|||
 ||Panasonic Whisper Coy heater/van 811A * Customer provided|||
 ||2 vanity lights |$503.05||
 ||2 vanity lights |$503.05||
 ||CREDIT FOR INSTALLATION OF CEILING FAN FROM INSURANCE. |-$250.00||
 ||CREDIT FOR INSTALLATION OF CEILING FAN FROM INSURANCE. |-$250.00||
@@ -155,7 +156,7 @@ I'm using this page to share some questions and comments with the contractor and
 |4. Vanity top and sinks|- Template and install|||
 |4. Vanity top and sinks|- Template and install|||
 ||Allowance for top and sinks Actual cost |$3,833.40||
 ||Allowance for top and sinks Actual cost |$3,833.40||
 |5. Shower door TO BE ON FINAL DRAW|- Custom shower door and installation allowance. |$3000.00||
 |5. Shower door TO BE ON FINAL DRAW|- Custom shower door and installation allowance. |$3000.00||
-|6. Mirror - remove existing mirror and reinstall.||$250.00|๐Ÿ‘ˆ๐Ÿปโ‰๏ธ duplicate|
+|6. Mirror - remove existing mirror and reinstall.||$250.00||
 |7. Install bathroom accessories|Grab bar 50.00 each * WILL BE ON FINAL INOICE|$0.00||
 |7. Install bathroom accessories|Grab bar 50.00 each * WILL BE ON FINAL INOICE|$0.00||
 ||Towel bars, robe hooks, toilet paper holder, and 2 hand towel rings.|$125.00||
 ||Towel bars, robe hooks, toilet paper holder, and 2 hand towel rings.|$125.00||
 ||Allowance on accessories * Cost of accessories including closet pulls |$388.64||
 ||Allowance on accessories * Cost of accessories including closet pulls |$388.64||
@@ -170,11 +171,12 @@ I'm using this page to share some questions and comments with the contractor and
 ||Installed outside light fixture |$80.00||
 ||Installed outside light fixture |$80.00||
 ||Installed uarter round in carpeted rooms|$200.00||
 ||Installed uarter round in carpeted rooms|$200.00||
 ||Quarter round|$61.63||
 ||Quarter round|$61.63||
-|9. Hung sheetrock on ceiling at upstairs bedroom and repaired closet ceiling and wall. |- Applied texture at repair area.|$2835.00|๐Ÿ‘ˆ๐Ÿป|
-|10. Caulked, primed, and puttied one new side and touched up handrails.||$7331.25|๐Ÿ‘ˆ๐Ÿปโ‰๏ธ|
+|9. Hung sheetrock on ceiling at upstairs bedroom and repaired closet ceiling and wall. |- Applied texture at repair area.|$2835.00||
+|10. Caulked, primed, and puttied one new side and touched up handrails.||$7331.25|๐Ÿ‘ˆ๐Ÿปโ‰๏ธ what is this?|
 |11. Blown in insulation in master bedroom ceiling. |* This was considerably less.|$480.00||
 |11. Blown in insulation in master bedroom ceiling. |* This was considerably less.|$480.00||
 |||||
 |||||
 ||<b>TOTAL</b>|<b>$93,006.97</b>||
 ||<b>TOTAL</b>|<b>$93,006.97</b>||
+||BALANCE|$0|โœ… Paid|
 |||||
 |||||
 
 
 <div><br/><br/></div>
 <div><br/><br/></div>
@@ -189,7 +191,7 @@ I'm using this page to share some questions and comments with the contractor and
 |||||
 |||||
 |REGARDING INVOICE #35663||||
 |REGARDING INVOICE #35663||||
 |1. Page 4 - Item # 5 - Shower door was invoiced at $3000.00 - Actual cost was $2918.00|- Labor and materials to install custom door. |-$82.00||
 |1. Page 4 - Item # 5 - Shower door was invoiced at $3000.00 - Actual cost was $2918.00|- Labor and materials to install custom door. |-$82.00||
-|2. Page 4 - Item #6 - Mirror - *|- cut existing mirror and installed |$190.00|๐Ÿ‘ˆ๐Ÿปโ‰๏ธ duplicate|
+|2. Page 4 - Item #6 - Mirror - *|- cut existing mirror and installed |$190.00||
 |3. Page 5 - Item #7 - install bathroom accessories|- Installed grab bar |$50.00||
 |3. Page 5 - Item #7 - install bathroom accessories|- Installed grab bar |$50.00||
 |||||
 |||||
 |Remaining items from the Insurance estimate that have not been invoiced.||||
 |Remaining items from the Insurance estimate that have not been invoiced.||||

+ 32 - 34
notes/house/kl-timmerman-issues.md

@@ -1,8 +1,7 @@
 ---
 ---
-title: Renovation Issues
+title: Renovation Notes
 image: https://davidawindham.com/wha/helene-1.jpg
 image: https://davidawindham.com/wha/helene-1.jpg
 hide_table_of_contents: true
 hide_table_of_contents: true
-draft: true
 ---
 ---
 
 
 :::warning[Private Page]
 :::warning[Private Page]
@@ -11,36 +10,32 @@ draft: true
 
 
 These are our notes related to the hurrican helene [repairs](/notes/house/helene) and post helene renovations on the [studio](/notes/house/studio), master, and [bath](/notes/house/bath). I'm using this page to share some questions and comments with the contractor and the boss.
 These are our notes related to the hurrican helene [repairs](/notes/house/helene) and post helene renovations on the [studio](/notes/house/studio), master, and [bath](/notes/house/bath). I'm using this page to share some questions and comments with the contractor and the boss.
 
 
-
-## Quality Control
-
 We've had some hiccups along the way, so I just wanted to start list of issues we've had with the general contractor and sub contractors so they're not forgotten if we need to reference them.
 We've had some hiccups along the way, so I just wanted to start list of issues we've had with the general contractor and sub contractors so they're not forgotten if we need to reference them.
 
 
 ## KL Timmerman Enterprises, LLC 
 ## KL Timmerman Enterprises, LLC 
 
 
 [log](/notes/house/kl-timmerman-log)
 [log](/notes/house/kl-timmerman-log)
 | [costs](/notes/house/kl-timmerman-costs)
 | [costs](/notes/house/kl-timmerman-costs)
-| [estimates](/pdf/KLTimmerman-Estimates.pdf)
-| [invoices](/pdf/KLTimmerman-Invoices.pdf)
-| [issues](/notes/house/)
+| [notes](/notes/house/kl-timmerman-issues)
 
 
 ## Management
 ## Management
 
 
 - Showed up on site unannounced requesting payment before work was completed or inspected
 - Showed up on site unannounced requesting payment before work was completed or inspected
 - Invoicing duplicate errors
 - Invoicing duplicate errors
   - No discussion of invoices
   - No discussion of invoices
-- Timeliness 
+  - invoices not organized
+- Timeliness ๐Ÿข
   - slow pace - some contractors will work for just a couple of hours a day for a week.
   - slow pace - some contractors will work for just a couple of hours a day for a week.
-  - took **over a year** to complete the project or **9 months** if you account for the truss manufacturing delay
+  - took almost a year - **10 months** if you account for the truss manufacturing delay to complete the project
 - very little inspection of work - **NO** final inspection
 - very little inspection of work - **NO** final inspection
-- General contractor has only been by the site twice to check up on work
-  - after the trusses were installed and after the the paint
+- General contractor has only been by the site a couple times to check up on work
+  - after the trusses were installed and after the interior paint
 - Assistant to GC not on site often
 - Assistant to GC not on site often
   - once on an emergency call after a leak
   - once on an emergency call after a leak
 - Not much supervision of subs
 - Not much supervision of subs
 - Communication lackluster
 - Communication lackluster
   - Inconsistent notice of subcontractors arriving onsite
   - Inconsistent notice of subcontractors arriving onsite
-    - sometimes no notice and sometimes just 15 minute notice
+    - sometimes no notice and sometimes just short notice
 - Broken Sewer Line
 - Broken Sewer Line
   - blowout line crushed by one of the haul off trucks or the lift equipment
   - blowout line crushed by one of the haul off trucks or the lift equipment
 - Subcontractors
 - Subcontractors
@@ -49,11 +44,11 @@ We've had some hiccups along the way, so I just wanted to start list of issues w
   - contractor puked in the yard because he came hungover
   - contractor puked in the yard because he came hungover
   - left food trash in buckets upstairs that caused am indoor bug infestation
   - left food trash in buckets upstairs that caused am indoor bug infestation
   - dumped rotten food in bushes
   - dumped rotten food in bushes
-  - paint in bushes and on house in cleaning
+  - paint dumped in bushes and spilled on house during brush cleaning
 - had to drive over to GA to confirm quartz because couldn't get what was promised
 - had to drive over to GA to confirm quartz because couldn't get what was promised
 - didn't fix cut drywall in downstairs bathroom for three months
 - didn't fix cut drywall in downstairs bathroom for three months
   - left it open and we taped the piece back into it
   - left it open and we taped the piece back into it
-  - still not painted
+  - still not painted ๐Ÿ‘ˆ๐Ÿป
 - contractors on site past normal working hours
 - contractors on site past normal working hours
 - contractor fishing in pond putting fish in bucket
 - contractor fishing in pond putting fish in bucket
 
 
@@ -61,13 +56,14 @@ We've had some hiccups along the way, so I just wanted to start list of issues w
 
 
 - studio left without hardware for three months
 - studio left without hardware for three months
 - leaking seal on pipe that ran into the wall and stained the ceiling on the floor below in both the den and downstairs bathroom
 - leaking seal on pipe that ran into the wall and stained the ceiling on the floor below in both the den and downstairs bathroom
+  - still not fixed ๐Ÿ‘ˆ๐Ÿป
 - hot water install mixed with cold water
 - hot water install mixed with cold water
   - we didn't have cold water for a couple of days
   - we didn't have cold water for a couple of days
 - covered existing electrical outlets
 - covered existing electrical outlets
 - didn't seal off area of drywall sanding
 - didn't seal off area of drywall sanding
   - no ventilation or air treatment
   - no ventilation or air treatment
   - didn't replace hvac intakes
   - didn't replace hvac intakes
-- installed tile inset the wrong direction
+- installed tile inset the wrong directiom
 - poured water under the house instead of piping it out
 - poured water under the house instead of piping it out
 - left a pile of debris in the yard for three months
 - left a pile of debris in the yard for three months
 - left the old sliding door in the yard for a month
 - left the old sliding door in the yard for a month
@@ -75,7 +71,7 @@ We've had some hiccups along the way, so I just wanted to start list of issues w
 - popcorn ceiling has visible seams
 - popcorn ceiling has visible seams
 - drywall not consistent or square in spots
 - drywall not consistent or square in spots
   - dropping drywall at hvac intake
   - dropping drywall at hvac intake
-  - not square where the corners meet
+  - not square where the corners meet ๐Ÿ‘ˆ๐Ÿป
   - didn't use the waterproof type throughout the bathroom
   - didn't use the waterproof type throughout the bathroom
   - made patches where it should have been an entire board replaced
   - made patches where it should have been an entire board replaced
   - bubbles showing through the paint
   - bubbles showing through the paint
@@ -86,26 +82,28 @@ We've had some hiccups along the way, so I just wanted to start list of issues w
 - broke glass into the yard by tossing shower doors over the ledge
 - broke glass into the yard by tossing shower doors over the ledge
 - didn't plug the two HVAC vents that were ducted into the closed ceiling
 - didn't plug the two HVAC vents that were ducted into the closed ceiling
 - found a previously split truss just one truss back from what was installed
 - found a previously split truss just one truss back from what was installed
-  - noticed but didn't mention it to us or offer to replace
+  - noticed but **didn't** mention it to us or offer to replace
     - given we had ordered one additional truss that was left at our house
     - given we had ordered one additional truss that was left at our house
 - left the extra truss in our yard for nine months
 - left the extra truss in our yard for nine months
 - didn't patch the ceiling until months after the trusses installed
 - didn't patch the ceiling until months after the trusses installed
-  - $600 heating cost to heat ceiling area
+  - $$$ heating cost to heat ceiling area
 - didn't tile all the way to the ceiling in shower as requested
 - didn't tile all the way to the ceiling in shower as requested
 - don't clean up after work
 - don't clean up after work
   - trash/food in yard, nails/metal in bushes
   - trash/food in yard, nails/metal in bushes
 - paint on window hardware
 - paint on window hardware
 - paint on tile floor
 - paint on tile floor
 - paint spills on front porch
 - paint spills on front porch
-- had to repaint and drywall because of poor work
-- didn't install backing support for grab bar
+- had to repaint from bad work on drywall
+  - still have bubbling in the paint in spots ๐Ÿ‘ˆ๐Ÿป
 - spilled a heavy amount of paint thinner into the subfloor which then permeated the house for a week causing headaches and eye irritation. So potent that any heating element like our oven on the first floor gave off a lighter fluid smell for a week.
 - spilled a heavy amount of paint thinner into the subfloor which then permeated the house for a week causing headaches and eye irritation. So potent that any heating element like our oven on the first floor gave off a lighter fluid smell for a week.
 - window treatments 
 - window treatments 
   - tub / vertical blinds
   - tub / vertical blinds
   - remove curtain rod
   - remove curtain rod
 - put the new carpet down before the contractors had finished the other work
 - put the new carpet down before the contractors had finished the other work
-  - carpet has visable seams
-  - carpet doesn't extent far enough under baseboards
+  - carpet has visible seams
+  - carpet doesn't extend far enough under baseboards
+- didn't caulk the quartz top to the tile inside the shower
+  - we did it ourselves ๐Ÿ‘ˆ๐Ÿป
 
 
 ## Punch List
 ## Punch List
 
 
@@ -113,7 +111,7 @@ We've had some hiccups along the way, so I just wanted to start list of issues w
 - rear upper deck & railings
 - rear upper deck & railings
   - ~~deck light~~
   - ~~deck light~~
 - ~~chimney seal, cap, & wrap~~
 - ~~chimney seal, cap, & wrap~~
-- caps on doubled 2x12s
+- caps on doubled 2x12s 
   - was told they would be caulked to look like 4x12s
   - was told they would be caulked to look like 4x12s
 - insulation and pipes in crawlspace
 - insulation and pipes in crawlspace
 - gap sealant on gas exhaust
 - gap sealant on gas exhaust
@@ -124,7 +122,7 @@ We've had some hiccups along the way, so I just wanted to start list of issues w
   - ~~hole in gutter to right of entrance~~
   - ~~hole in gutter to right of entrance~~
   - water dripping along wood under upper gutter.
   - water dripping along wood under upper gutter.
   - ~~leaking downspout connector entrance~~
   - ~~leaking downspout connector entrance~~
-- painting in spots
+- painting
   - siding
   - siding
   - paint spills on porch, side of house, and upper deck
   - paint spills on porch, side of house, and upper deck
 - front doors - were measured but not follow up
 - front doors - were measured but not follow up
@@ -142,31 +140,30 @@ We've had some hiccups along the way, so I just wanted to start list of issues w
 - ~~bad water pressure~~
 - ~~bad water pressure~~
   - ~~remove water restrictors?~~
   - ~~remove water restrictors?~~
   - check sewer leak?
   - check sewer leak?
-  - had failed to clean out heads on faucets.
-- bathtub not properly installed ๐Ÿ‘ˆ๐Ÿป
+  - ~~had failed to clean dirt from heads on faucets.~~
+- bathtub not properly installed based on manufacturers manual ๐Ÿ‘ˆ๐Ÿป
   - slides around
   - slides around
     - no blocking as specified in manual
     - no blocking as specified in manual
   - no additional 2x12s as specified in manual
   - no additional 2x12s as specified in manual
   - no backsplash or water proofing on the wall of bathtub ๐Ÿ‘ˆ๐Ÿป
   - no backsplash or water proofing on the wall of bathtub ๐Ÿ‘ˆ๐Ÿป
   - white caulk on bathtub filler
   - white caulk on bathtub filler
-- sliding door not caulked
-  - sliding poor trim paint/stain
+- ~~sliding door not caulked~~
+  - ~~sliding poor trim paint/stain~~
 - ~~ceiling fan~~
 - ~~ceiling fan~~
 - paint on tile floor
 - paint on tile floor
 - ~~no backing support for grab bars behind tile~~
 - ~~no backing support for grab bars behind tile~~
   - ~~broken grab bar install~~
   - ~~broken grab bar install~~
 - damaged bi-fold doors
 - damaged bi-fold doors
-  - broken hardware on bifold doors
   - split wood on the base of closet doors
   - split wood on the base of closet doors
 - door hardware for bedroom
 - door hardware for bedroom
 - cracked floor trim from carpet puller
 - cracked floor trim from carpet puller
 - ~~closet shelves needs to be split for attic~~
 - ~~closet shelves needs to be split for attic~~
-  - didn't closet shelves
+  - didn't replace closet shelves
 - ~~carpet doesn't meet baseboards~~
 - ~~carpet doesn't meet baseboards~~
   - carpet transition to tile ๐Ÿ‘ˆ๐Ÿป
   - carpet transition to tile ๐Ÿ‘ˆ๐Ÿป
   - ~~feel tacks on bare feet~~
   - ~~feel tacks on bare feet~~
 - dressing room 
 - dressing room 
-  - drawers/hardware
+  - ~~drawers/hardware~~
   - stained seat top
   - stained seat top
   - lighting? extra switch? ๐Ÿ‘ˆ๐Ÿป
   - lighting? extra switch? ๐Ÿ‘ˆ๐Ÿป
   - ~~bathroom switches upside down~~
   - ~~bathroom switches upside down~~
@@ -175,9 +172,10 @@ We've had some hiccups along the way, so I just wanted to start list of issues w
   - crooked wall in bedroom corner
   - crooked wall in bedroom corner
   - tape marks in ceiling
   - tape marks in ceiling
   - wavy at bed entrance - too many repair pieces
   - wavy at bed entrance - too many repair pieces
-  - splotchy above bed
+  - splotchy bubbles above bed
   - spots on bathroom ceiling
   - spots on bathroom ceiling
+  - stairwell trim paint baseboards
 - downstairs ceiling repair from two separate leaks and jackhammer cracking ๐Ÿ‘ˆ๐Ÿป
 - downstairs ceiling repair from two separate leaks and jackhammer cracking ๐Ÿ‘ˆ๐Ÿป
 - downstairs bathroom paint ๐Ÿ‘ˆ๐Ÿป
 - downstairs bathroom paint ๐Ÿ‘ˆ๐Ÿป
-- stairwell trim paint baseboards
+
 
 

+ 49 - 51
notes/house/kl-timmerman-log.md

@@ -18,9 +18,7 @@ These are the dates of the work performed on site
 
 
 [log](/notes/house/kl-timmerman-log)
 [log](/notes/house/kl-timmerman-log)
 | [costs](/notes/house/kl-timmerman-costs)
 | [costs](/notes/house/kl-timmerman-costs)
-| [estimates](/pdf/KLTimmerman-Estimates.pdf)
-| [invoices](/pdf/KLTimmerman-Invoices.pdf)
-| [issues](/notes/house/)
+| [notes](/notes/house/kl-timmerman-issues)
 
 
 ## Log
 ## Log
 
 
@@ -48,58 +46,58 @@ These are the dates of the work performed on site
 |**25/09/22**    | subfloor demo|3||
 |**25/09/22**    | subfloor demo|3||
 |**25/09/18**    | countertop install|3||
 |**25/09/18**    | countertop install|3||
 |**25/09/18**    | glass measure / GC by|1||
 |**25/09/18**    | glass measure / GC by|1||
-|**25/09/17**    | gutter guy by to measure again|||
-|**25/09/08**    | carpenter dressing room drawers|||
-|**25/09/05**    | bath counter measure|||
-|**25/09/05**    | - painters ( exterior - second finish )|||
-|**25/09/04**    | - painters ( interior )|||
-|**25/09/03**    | - painters ( interior )|||
-|**25/09/02**    | painters ( interior )|||
+|**25/09/17**    | gutter guy by to measure again|1||
+|**25/09/08**    | carpenter dressing room drawers|5||
+|**25/09/05**    | bath counter measure|1||
+|**25/09/05**    | - painters ( exterior - second finish )|2||
+|**25/09/04**    | - painters ( interior )|4||
+|**25/09/03**    | - painters ( interior )|4||
+|**25/09/02**    | painters ( interior )|3||
 |**25/09/03**    | plumbing ( *downstairs bathroom fix )||(separate vendor/invoice)|
 |**25/09/03**    | plumbing ( *downstairs bathroom fix )||(separate vendor/invoice)|
-|**25/08/28**    | - carpenter - dressing Room|||
-|**25/08/27**    | carpenter - dressing Room|||
-|**25/08/26**    | plumbing Tankless & Fix hot water issue|||
-|**25/08/25**    | electrician crawlspace tankless|5||
-|**25/08/15,18** | plumbing/CPW - Tankless|||
-|**25/08/04-8**  | painters|||
-|**25/07/28-29** | doors/Trim|||
-|**25/07/21-23** | tile install Bathroom|||
-|**24/07/17**    | sliding Door Installation & drywall finishing|||
-|**24/07/14-15** | drywall & insulation|||
-|**24/07/10-11** | exterior paint|||
-|**25/07/10**    | electrician - adjust hall outlet|||
-|**25/07/07**    | - drywall Mud ( 2 days ) / Adjust kneewall|||
-|**24/07/02**    | drywall up|||
-|**25/06/30-1**  | electrical|||
-|**25/06/26**    | electrician/GC on site meeting|||
-|**25/06/20**    | plumbers|||
-|**25/06/18**    | plumbers - Austin & Christian|||
-|**25/06/17**    | plumbers - Harvey & Austin |||
-|**25/06/03**    | Quarle's / Snead's supply shopping|||
-|**25/06/11**    | - Demo|||
-|**25/06/10**    | - Demo|||
-|**25/06/04-11** | - Demo|||
-|**25/06/03-11** | - Demo|||
+|**25/08/28**    | - carpenter - dressing Room|4||
+|**25/08/27**    | carpenter - dressing Room|3||
+|**25/08/26**    | plumbing Tankless & Fix hot water issue|2||
+|**25/08/25**    | electrician crawlspace tankless|2||
+|**25/08/15,18** | plumbing/CPW - Tankless|3||
+|**25/08/04-8**  | painters|3||
+|**25/07/28-29** | doors/Trim|3||
+|**25/07/21-23** | tile install Bathroom|7||
+|**24/07/17**    | sliding Door Installation & drywall finishing|5||
+|**24/07/14-15** | drywall & insulation|5||
+|**24/07/10-11** | exterior paint|3||
+|**25/07/10**    | electrician - adjust hall outlet|2||
+|**25/07/07**    | - drywall Mud ( 2 days ) / Adjust kneewall|4||
+|**24/07/02**    | drywall up|5||
+|**25/06/30-1**  | electrical|2||
+|**25/06/26**    | electrician/GC on site meeting|1||
+|**25/06/20**    | plumbers|3||
+|**25/06/18**    | plumbers - Austin & Christian|3||
+|**25/06/17**    | plumbers - Harvey & Austin |2||
+|**25/06/03**    | Quarle's / Snead's supply shopping|1||
+|**25/06/11**    | - Demo|4||
+|**25/06/10**    | - Demo|5||
+|**25/06/04-11** | - Demo|5||
+|**25/06/03-11** | - Demo|6||
 |**25/06/02-11** | Demo Tank & Austin (x2) ( 4.5 days 2,3,4,10,11 )|||
 |**25/06/02-11** | Demo Tank & Austin (x2) ( 4.5 days 2,3,4,10,11 )|||
-|**25/04/10**    | roofer roof replaced - 7am -> 6pm - finished |||
-|**25/03/27**    | - cabinets|||
-|**25/03/26**    | cabinets installed|||
-|**25/03/19**    | glass measure|||
-|**25/03/18**    | Beth over for walkthrough mockup|||
-|**25/03/19**    | - Framing (x4) crew|||
-|**25/03/18**    | - Framing (x4) crew|||
-|**25/03/17**    | - Framing (x4) crew|||
-|**25/03/13**    | - Framing (x4) crew|||
-|**25/03/12**    | - Framing (x4) crew|||
-|**25/03/11**    | - Framing (x4) crew|||
-|**25/03/10**    | Framing crew - trusses installed / siding repaired|||
-|**25/02/28**    | received final mockup of the remodel from Beth |||
-|**25/02/12**    | cabinet guy over for measurements|||
-|**25/02/06**    | trusses delivered|||
-|**24/11/13**    | Beth over for design measurements|||
+|**25/04/10**    | roofer roof replaced - 7am -> 6pm - finished |9||
+|**25/03/27**    | - cabinets(downstairs)|4||
+|**25/03/26**    | cabinets(downstairs) installed|5||
+|**25/03/19**    | glass measure|1||
+|**25/03/18**    | Beth over for walkthrough mockup|1||
+|**25/03/19**    | - Framing (x4) crew|4||
+|**25/03/18**    | - Framing (x4) crew|6||
+|**25/03/17**    | - Framing (x4) crew|7||
+|**25/03/13**    | - Framing (x4) crew|5||
+|**25/03/12**    | - Framing (x4) crew|6||
+|**25/03/11**    | - Framing (x4) crew|7||
+|**25/03/10**    | Framing crew - trusses installed / siding repaired|4||
+|**25/02/28**    | received final mockup of the remodel from Beth |n/a||
+|**25/02/12**    | cabinet guy over for measurements|1||
+|**25/02/06**    | trusses delivered|1||
+|**24/11/13**    | Beth over for design measurements|1||
 |**24/11/11**    |  truss measurements|||
 |**24/11/11**    |  truss measurements|||
 |**24/11/06**    | demo for truss measurements|3||
 |**24/11/06**    | demo for truss measurements|3||
 |**24/10/28**    | Ken and Insurance Adjuster meet|2||
 |**24/10/28**    | Ken and Insurance Adjuster meet|2||
 ||||
 ||||
 |**TOTAL**| **DAYS**|**HOURS**|
 |**TOTAL**| **DAYS**|**HOURS**|
-||||
+||**75 Days**|**241 Hours**|