@@ -9,98 +9,26 @@ draft: true
|
|
|
|
|
|
:::
|
|
|
|
|
|
-These are our notes related to the hurrican helene [repairs](/notes/house/helene) and post helene renovations on the [studio](/notes/house/studio), master, and [bath](/notes/house/bath). I'm using this page to share some questions and comments with the contractor and the boss. We've also started a document for the contractor [costs](/notes/house/kl-timmerman-costs).
|
|
|
+These are our notes related to the hurrican helene [repairs](/notes/house/helene) and post helene renovations on the [studio](/notes/house/studio), master, and [bath](/notes/house/bath). I'm using this page to share some questions and comments with the contractor and the boss.
|
|
|
|
|
|
|
|
|
-## KL Timmerman Enterprises, LLC
|
|
|
-
|
|
|
-## Quality Control Issues
|
|
|
+## Quality Control
|
|
|
|
|
|
We've had some hiccups along the way, so I just wanted to start list of issues we've had with the general contractor and sub contractors so they're not forgotten if we need to reference them.
|
|
|
|
|
|
-## Punch List
|
|
|
-
|
|
|
-**Exterior**
|
|
|
-- rear upper deck & railings
|
|
|
- - ~~deck light~~
|
|
|
-- ~~chimney seal, cap, & wrap~~
|
|
|
-- caps on doubled 2x12s
|
|
|
- - was told they would be caulked to look like 4x12s
|
|
|
-- insulation and pipes in crawlspace
|
|
|
-- gap sealant on gas exhaust
|
|
|
-- proper drainage valves on hot water heater?
|
|
|
-- gutters left metal intact from previous gutters
|
|
|
- - leaving visible gaps under the shingles that are large enough that small critters could enter the attic.
|
|
|
- - ~~missing downspouts on gutters~~
|
|
|
- - ~~hole in gutter to right of entrance~~
|
|
|
- - water dripping along wood under upper gutter.
|
|
|
- - ~~leaking downspout connector entrance~~
|
|
|
-- painting in spots
|
|
|
- - siding
|
|
|
- - paint spills on porch, side of house, and upper deck
|
|
|
-- front doors - were measured but not follow up
|
|
|
-- ~~haul off~~
|
|
|
- - ~~truss & doors~~
|
|
|
- - ~~ladder from painters~~
|
|
|
-- replace 3 gallons of exterior paint ๐๐ป
|
|
|
-
|
|
|
-**Interior**
|
|
|
-
|
|
|
-- bathroom hardware
|
|
|
- - ~~shower handrails~~
|
|
|
-- ~~hvac ductwork~~
|
|
|
-- ~~broken shower wand tube~~
|
|
|
-- ~~bad water pressure~~
|
|
|
- - ~~remove water restrictors?~~
|
|
|
- - check sewer leak?
|
|
|
- - had failed to clean out heads on faucets.
|
|
|
-- bathtub not properly installed ๐๐ป
|
|
|
- - slides around
|
|
|
- - no blocking as specified in manual
|
|
|
- - no additional 2x12s as specified in manual
|
|
|
- - no backsplash or water proofing on the wall of bathtub ๐๐ป
|
|
|
- - white caulk on bathtub filler
|
|
|
-- sliding door not caulked
|
|
|
- - sliding poor trim paint/stain
|
|
|
-- ~~ceiling fan~~
|
|
|
-- paint on tile floor
|
|
|
-- ~~no backing support for grab bars behind tile~~
|
|
|
- - ~~broken grab bar install~~
|
|
|
-- damaged bi-fold doors
|
|
|
- - broken hardware on bifold doors
|
|
|
- - split wood on the base of closet doors
|
|
|
-- door hardware for bedroom
|
|
|
-- cracked floor trim from carpet puller
|
|
|
-- ~~closet shelves needs to be split for attic~~
|
|
|
- - didn't closet shelves
|
|
|
-- ~~carpet doesn't meet baseboards~~
|
|
|
- - carpet transition to tile ๐๐ป
|
|
|
- - ~~feel tacks on bare feet~~
|
|
|
-- dressing room
|
|
|
- - drawers/hardware
|
|
|
- - stained seat top
|
|
|
- - lighting? extra switch? ๐๐ป
|
|
|
- - ~~bathroom switches upside down~~
|
|
|
- - ~~stairway light switch~~
|
|
|
-- lots of questionable drywall/paint work ๐๐ป
|
|
|
- - crooked wall in bedroom corner
|
|
|
- - tape marks in ceiling
|
|
|
- - wavy at bed entrance - too many repair pieces
|
|
|
- - splotchy above bed
|
|
|
- - spots on bathroom ceiling
|
|
|
-- downstairs ceiling repair from two separate leaks and jackhammer cracking ๐๐ป
|
|
|
-- downstairs bathroom paint ๐๐ป
|
|
|
-- stairwell trim paint baseboards
|
|
|
-
|
|
|
-
|
|
|
-**Minor**
|
|
|
-- window treatments
|
|
|
- - tub / vertical blinds
|
|
|
- - remove curtain rod
|
|
|
+## KL Timmerman Enterprises, LLC
|
|
|
|
|
|
+[log](/notes/house/kl-timmerman-log)
|
|
|
+| [costs](/notes/house/kl-timmerman-costs)
|
|
|
+| [estimates](/pdf/KLTimmerman-Estimates.pdf)
|
|
|
+| [invoices](/pdf/KLTimmerman-Invoices.pdf)
|
|
|
+| [issues](/notes/house/)
|
|
|
|
|
|
## Management
|
|
|
|
|
|
+- Showed up on site unannounced requesting payment before work was completed or inspected
|
|
|
+- Invoicing duplicate errors
|
|
|
+ - No discussion of invoices
|
|
|
- Timeliness
|
|
|
- slow pace - some contractors will work for just a couple of hours a day for a week.
|
|
|
- took **over a year** to complete the project or **9 months** if you account for the truss manufacturing delay
|
|
|
@@ -140,7 +68,6 @@ We've had some hiccups along the way, so I just wanted to start list of issues w
|
|
|
- no ventilation or air treatment
|
|
|
- didn't replace hvac intakes
|
|
|
- installed tile inset the wrong direction
|
|
|
-- left hvac ducts unpatched for months. I finally patched them.
|
|
|
- poured water under the house instead of piping it out
|
|
|
- left a pile of debris in the yard for three months
|
|
|
- left the old sliding door in the yard for a month
|
|
|
@@ -151,13 +78,16 @@ We've had some hiccups along the way, so I just wanted to start list of issues w
|
|
|
- not square where the corners meet
|
|
|
- didn't use the waterproof type throughout the bathroom
|
|
|
- made patches where it should have been an entire board replaced
|
|
|
+ - bubbles showing through the paint
|
|
|
- ripped out a closet that didn't need to be removed
|
|
|
- threw away good materials and unnecessary demo
|
|
|
- - duct vents, bi-fold doors
|
|
|
+ - duct vents & bi-fold doors
|
|
|
+ - replaced solid wood closet and room doors with lesser quality
|
|
|
- broke glass into the yard by tossing shower doors over the ledge
|
|
|
- didn't plug the two HVAC vents that were ducted into the closed ceiling
|
|
|
- found a previously split truss just one truss back from what was installed
|
|
|
- - didn't mention it to us
|
|
|
+ - noticed but didn't mention it to us or offer to replace
|
|
|
+ - given we had ordered one additional truss that was left at our house
|
|
|
- left the extra truss in our yard for nine months
|
|
|
- didn't patch the ceiling until months after the trusses installed
|
|
|
- $600 heating cost to heat ceiling area
|
|
|
@@ -170,14 +100,84 @@ We've had some hiccups along the way, so I just wanted to start list of issues w
|
|
|
- had to repaint and drywall because of poor work
|
|
|
- didn't install backing support for grab bar
|
|
|
- spilled a heavy amount of paint thinner into the subfloor which then permeated the house for a week causing headaches and eye irritation. So potent that any heating element like our oven on the first floor gave off a lighter fluid smell for a week.
|
|
|
+- window treatments
|
|
|
+ - tub / vertical blinds
|
|
|
+ - remove curtain rod
|
|
|
- put the new carpet down before the contractors had finished the other work
|
|
|
- carpet has visable seams
|
|
|
- carpet doesn't extent far enough under baseboards
|
|
|
|
|
|
-## Billing
|
|
|
+## Punch List
|
|
|
+
|
|
|
+**Exterior**
|
|
|
+- rear upper deck & railings
|
|
|
+ - ~~deck light~~
|
|
|
+- ~~chimney seal, cap, & wrap~~
|
|
|
+- caps on doubled 2x12s
|
|
|
+ - was told they would be caulked to look like 4x12s
|
|
|
+- insulation and pipes in crawlspace
|
|
|
+- gap sealant on gas exhaust
|
|
|
+- proper drainage valves on hot water heater?
|
|
|
+- gutters left metal intact from previous gutters
|
|
|
+ - leaving visible gaps under the shingles that are large enough that small critters could enter the attic.
|
|
|
+ - ~~missing downspouts on gutters~~
|
|
|
+ - ~~hole in gutter to right of entrance~~
|
|
|
+ - water dripping along wood under upper gutter.
|
|
|
+ - ~~leaking downspout connector entrance~~
|
|
|
+- painting in spots
|
|
|
+ - siding
|
|
|
+ - paint spills on porch, side of house, and upper deck
|
|
|
+- front doors - were measured but not follow up
|
|
|
+- ~~haul off~~
|
|
|
+ - ~~truss & doors~~
|
|
|
+ - ~~ladder from painters~~
|
|
|
+- replace 3 gallons of exterior paint ๐๐ป
|
|
|
+
|
|
|
+**Interior**
|
|
|
+
|
|
|
+- bathroom hardware
|
|
|
+ - ~~shower handrails~~
|
|
|
+- ~~hvac ductwork~~
|
|
|
+- ~~broken shower wand tube~~
|
|
|
+- ~~bad water pressure~~
|
|
|
+ - ~~remove water restrictors?~~
|
|
|
+ - check sewer leak?
|
|
|
+ - had failed to clean out heads on faucets.
|
|
|
+- bathtub not properly installed ๐๐ป
|
|
|
+ - slides around
|
|
|
+ - no blocking as specified in manual
|
|
|
+ - no additional 2x12s as specified in manual
|
|
|
+ - no backsplash or water proofing on the wall of bathtub ๐๐ป
|
|
|
+ - white caulk on bathtub filler
|
|
|
+- sliding door not caulked
|
|
|
+ - sliding poor trim paint/stain
|
|
|
+- ~~ceiling fan~~
|
|
|
+- paint on tile floor
|
|
|
+- ~~no backing support for grab bars behind tile~~
|
|
|
+ - ~~broken grab bar install~~
|
|
|
+- damaged bi-fold doors
|
|
|
+ - broken hardware on bifold doors
|
|
|
+ - split wood on the base of closet doors
|
|
|
+- door hardware for bedroom
|
|
|
+- cracked floor trim from carpet puller
|
|
|
+- ~~closet shelves needs to be split for attic~~
|
|
|
+ - didn't closet shelves
|
|
|
+- ~~carpet doesn't meet baseboards~~
|
|
|
+ - carpet transition to tile ๐๐ป
|
|
|
+ - ~~feel tacks on bare feet~~
|
|
|
+- dressing room
|
|
|
+ - drawers/hardware
|
|
|
+ - stained seat top
|
|
|
+ - lighting? extra switch? ๐๐ป
|
|
|
+ - ~~bathroom switches upside down~~
|
|
|
+ - ~~stairway light switch~~
|
|
|
+- lots of questionable drywall/paint work ๐๐ป
|
|
|
+ - crooked wall in bedroom corner
|
|
|
+ - tape marks in ceiling
|
|
|
+ - wavy at bed entrance - too many repair pieces
|
|
|
+ - splotchy above bed
|
|
|
+ - spots on bathroom ceiling
|
|
|
+- downstairs ceiling repair from two separate leaks and jackhammer cracking ๐๐ป
|
|
|
+- downstairs bathroom paint ๐๐ป
|
|
|
+- stairwell trim paint baseboards
|
|
|
|
|
|
-- quotes and invoicing inconsistent.
|
|
|
-- Showed up on site requesting payment before work was completed or inspected
|
|
|
-- No discussion of invoicing changes
|
|
|
-- Invoicing duplicate errors
|
|
|
-- aggressive labor charges
|