title: Issues
image: https://davidawindham.com/wha/helene-1.jpg
draft: true
Issues
We've had some hiccups along the way, so I just wanted to start list of issues we've had with the general contractor and sub contractors so they're not forgotten when we need to reference them.
Punch List
Exterior
- rear upper deck & railings
- caps on doubled 2x12s
- was told they would be caulked to look like 4x12s
- insulation and pipes in crawlspace
- proper drainage pipes on hot water heater
- chimney seal, cap, & wrap
- gutters left metal intact from previous gutters
- leaving visable gaps under the shingles that are large enough that small critters could enter the attic.
- missing downspouts on gutters
- hole in gutter to right of entrance
- water dripping along wood under upper gutter.
- leaking downspout connector entrance
- painting in spots
- front doors - were measured but not follow up
Interior
- missing closet lights
- hvac ductwork
- damaged sliding doors
- broken hardware on bifold doors
- door hardware for bedroom
- missing foot boards and crown molding
- crooked wall in bedroom corner
- lots of bad drywall work
- sliding door not caulked
- broken shower wand tube
- downstairs ceiling repair from two separate leaks and jackhammer cracking
- downstairs bathroom paint
- bathtub not properly installed
- no backsplash or water proofing on the wall of bathtub
- white caulk on bathtub faucet
- paint on tile floor
- cracked floor trim from carpet puller
Management
- Timeliness
- slow pace - some contractors will work for just a couple of hours a day for a week.
- took over a year to complete the project
- General contractor has only been by the site once to check up on work
- after the trusses were installed
- Assistant to GC has only been on site to check on work five times
- Not much supervision of subs
- Communication lackluster
- Inconsistent notice of subcontractors arriving onsite
- sometimes no notice and sometimes just 15 minute notice
- Broken Sewer Line
- blowout line crushed by one of the haul off trucks or the lift equipment
- Subcontractors
- contractor shit in our backyard - dog was eating something and noticed the roll of toilet paper
- contractors peeing in our driveway
- contractor puked in the yard because he came hungover
- left food trash in buckets upstairs that caused am indoor bug infestation
- had to drive over to GA to confirm quartz because couldn't get what was promised
- didn't communicate the schluter was horizontal and not vertical
- didn't fix cut drywall in downstairs bathroom for quite some time
- left it open and we taped the piece back into it
- had contractors on site past normal working hours
- Contractor fishing in pond putting fish in bucket
- Requested payment before work was completed
- saying that you had 'had a lot of money' out there
- promised to charge costs on materials
- no accountability on the arrival or departure times of subs.
Craftsmanship
- studio left without hardware for three months
- leaking seal on pipe that ran into the wall and stained the ceiling on the floor below in both the den and downstairs bathroom
- hot water install mixed with cold water so we didn't have cold water for a couple days
- covered existing electrical outlets
- didn't seal off area of drywall sanding
- no ventilation or air treatment
- installed tile inset the wrong direction
- left hvac ducts unpatched for months. I finally patched them.
- poured water under the house instead of piping it out
- left a pile of debris in the yard for three months
- left the old sliding door in the yard for a month
- we personally hauled off several loads of trash
- popcorn ceiling has visible seam
- drywall not consistent or square in spots
- dropping drywall at hvac intake
- not square where the corners meet
- didn't use the waterproof type throughout the bathroom
- made patches where it should have been an entire board replaced
- only partial bathroom in water resistant
- ripped out a closet that didn't need to be removed
- threw away good materials and unnecessary demo
- duct vents, bi-fold doors
- broke glass into the yard by tossing shower doors over the ledge
- didn't plug the two HVAC vents that were ducted into the closed ceiling
- found a previously split truss just one truss back from what was installed
- left the extra truss in our yard for nine months
- didn't patch the ceiling until months after the trusses installed
- $600 heating cost to heat ceiling area
- don't clean up after work
- trash/food in yard, nails/metal in bushes
- paint on window hardware
- paint on tile floor
- had to repaint and drywall because of poor work
- didn't install backing support for grab bar
- spilled a heavy amount of paint thinner into the subfloor which then permeated the house for a week causing headaches and eye irritation. So potent that any heating element like our oven on the first floor gave off a lighter fluid smell for a week.
- put the new carpet down before the contractors had finished the other work
Billing
- quotes and invoicing incomplete
- requested payment before work was completed
- no discussion of invoicing changes