Punch List

Exterior

  • rear upper deck & railings
    • deck light
  • caps on doubled 2x12s
    • was told they would be caulked to look like 4x12s
  • insulation and pipes in crawlspace
  • proper drainage pipes on hot water heater
  • chimney seal, cap, & wrap
  • gutters left metal intact from previous gutters
    • leaving visable gaps under the shingles that are large enough that small critters could enter the attic.
  • missing downspouts on gutters
  • hole in gutter to right of entrance
  • water dripping along wood under upper gutter.
  • leaking downspout connector entrance
  • painting in spots
  • front doors - were measured but not follow up

Interior

  • missing closet lights
  • hvac ductwork
  • damaged sliding doors
  • broken hardware on bifold doors
  • door hardware for bedroom
  • missing foot boards and crown molding
  • crooked wall in bedroom corner
  • lots of bad drywall work
    • tape marks in ceiling
  • sliding door not caulked
  • broken shower wand tube
  • downstairs ceiling repair from two separate leaks and jackhammer cracking
  • downstairs bathroom paint
  • bathtub not properly installed
    • slides around
  • no backsplash or water proofing on the wall of bathtub
  • white caulk on bathtub faucet
  • paint on tile floor
  • cracked floor trim from carpet puller

Management

  • Timeliness
    • slow pace - some contractors will work for just a couple of hours a day for a week.
    • took over a year to complete the project
  • General contractor has only been by the site once to check up on work
    • after the trusses were installed
  • Assistant to GC has only been on site to check on work five times
    • once was after a leak
  • Not much supervision of subs
  • Communication lackluster
    • Inconsistent notice of subcontractors arriving onsite
    • sometimes no notice and sometimes just 15 minute notice
  • Broken Sewer Line
    • blowout line crushed by one of the haul off trucks or the lift equipment
  • Subcontractors
    • contractor shit in our backyard - dog was eating something and noticed the roll of toilet paper
    • contractors peeing in our driveway
    • contractor puked in the yard because he came hungover
    • left food trash in buckets upstairs that caused am indoor bug infestation
  • had to drive over to GA to confirm quartz because couldn't get what was promised
  • didn't communicate the schluter was horizontal and not vertical
  • didn't fix cut drywall in downstairs bathroom for quite some time
    • left it open and we taped the piece back into it
  • had contractors on site past normal working hours
  • Contractor fishing in pond putting fish in bucket
  • Requested payment before work was completed
    • saying that you had 'had a lot of money' out there
  • promised to charge costs on materials
  • no accountability on the arrival or departure times of subs.

Craftsmanship

  • studio left without hardware for three months
  • leaking seal on pipe that ran into the wall and stained the ceiling on the floor below in both the den and downstairs bathroom
  • hot water install mixed with cold water so we didn't have cold water for a couple days
  • covered existing electrical outlets
  • didn't seal off area of drywall sanding
    • no ventilation or air treatment
  • installed tile inset the wrong direction
  • left hvac ducts unpatched for months. I finally patched them.
  • poured water under the house instead of piping it out
  • left a pile of debris in the yard for three months
  • left the old sliding door in the yard for a month
  • we personally hauled off several loads of trash
  • popcorn ceiling has visible seam
  • drywall not consistent or square in spots
    • dropping drywall at hvac intake
    • not square where the corners meet
    • didn't use the waterproof type throughout the bathroom
    • made patches where it should have been an entire board replaced
    • only partial bathroom in water resistant
  • ripped out a closet that didn't need to be removed
  • threw away good materials and unnecessary demo
    • duct vents, bi-fold doors
  • broke glass into the yard by tossing shower doors over the ledge
  • didn't plug the two HVAC vents that were ducted into the closed ceiling
  • found a previously split truss just one truss back from what was installed
  • left the extra truss in our yard for nine months
  • didn't patch the ceiling until months after the trusses installed
    • $600 heating cost to heat ceiling area
  • don't clean up after work
    • trash/food in yard, nails/metal in bushes
  • paint on window hardware
  • paint on tile floor
  • had to repaint and drywall because of poor work
  • didn't install backing support for grab bar
  • spilled a heavy amount of paint thinner into the subfloor which then permeated the house for a week causing headaches and eye irritation. So potent that any heating element like our oven on the first floor gave off a lighter fluid smell for a week.
  • put the new carpet down before the contractors had finished the other work

Billing

  • quotes and invoicing incomplete
    • requested payment before work was completed
    • no discussion of invoicing changes