We've had some hiccups along the way, so I just wanted to start list of issues we've had with the general contractor and sub contractors so they're not forgotten in case we need it.

Management

  • General contractor has only been by the site once to check up on work - after the trusses were installed
  • Assistant to GC has only been by four times
    • got upset when we requested that a sub look at the broken sewer line
  • Not much supervision of subs
  • Communication lackluster
    • quotes and invoicing incomplete
    • requested payment before work was completed
    • Inconsistent notice of subcontractors arriving onsite
    • sometimes no notice and sometimes just 15 minute notice
  • Timeliness
    • slow pace - some contractors will work for just a couple of hours a day for a week.
  • Broken Sewer Line
    • blowout line crushed by one of the haul off trucks or the lift equipment
  • Subcontractors
    • contractor shit in our backyard - dog was eating something and noticed the roll of toilet paper
    • contractors peeing in our driveway
    • contractor puked in the yard because he came hungover
    • left food trash in buckets upstairs that caused a bug infestation
  • had to drive over to GA to confirm quartz because couldn't get what was promised
  • didn't communicate the schluter was horizontal and not vertical
  • didn't fix cut drywall in downstairs bathroom for quite some time
    • left it open and we taped the piece back into it

Craftsmanship

  • leaking seal on pipe that ran into the wall and stained the ceiling on the floor below in both the den and downstairs bathroom
  • hot water install mixed with cold water so we didn't have cold water for a couple days
  • poured water under the house instead of piping it out
  • left a pile of debris in the yard for three months
  • left the old sliding door in the yard for a month
  • we personally hauled off several loads of trash
  • drywall not consistent or square in spots
    • dropping drywall at hvac intake
    • not square where the corners meet
    • didn't use the waterproof type throughout the bathroom
    • made patches where it should have been an entire board replaced
  • ripped out a closet that didn't need to be removed
  • threw away good materials and unnecessary demo
    • duct vents, bi-fold doors
  • broke glass into the yard by tossing shower doors over the ledge
  • didn't plug the two HVAC vents that were ducted into the closed ceiling
  • didn't patch the ceiling until months after the trusses installed
    • $600 heating cost to heat ceiling area
  • don't clean up after work
    • sawdust in the drive
    • trash in yard
  • broken hardware on bifold doors
  • paint on tile floor
  • had to repaint and drywall because of poor work
  • didn't install backing support for grab bar
  • spilled a heavy amount of paint thinner into the subfloor which then permeated the house for a week causing headaches and eye irritation. So potent that any heating element like our oven on the first floor gave off a lighter fluid smell for a week.

Costs

  • Requested payment before work was completed
    • saying that y'all 'had a lot of money' out there
  • promised to charge costs on materials